Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project generally consists of construction work at three ponds. Work at each pond is summarized as follows: burland pond 1: construction of a new combined low-level outlet works and service spillway structure, and construction of a new emergency spillway channel. The project also includes a raise of the existing dam embankment, and construction of a new dry hydrant. Burland pond 2: construction of a new low-level outlet works, and construction of a new emergency spillway training berm. The project also includes construction of a new toe drain system, and construction of a new dry hydrant. Burland pond 3: construction of a new combined low-level outlet works and service spillway structure, and enlargement of the existing emergency spillway channel. The project also includes a raise of the existing dam embankment, construction of new downstream slope erosion protection, and construction of a new dry hydrant.
Posted Date
Dec 26, 2025
Due Date
Feb 27, 2026
Release: Dec 26, 2025
Close: Feb 27, 2026
The project generally consists of construction work at three ponds. Work at each pond is summarized as follows: burland pond 1: construction of a new combined low-level outlet works and service spillway structure, and construction of a new emergency spillway channel. The project also includes a raise of the existing dam embankment, and construction of a new dry hydrant. Burland pond 2: construction of a new low-level outlet works, and construction of a new emergency spillway training berm. The project also includes construction of a new toe drain system, and construction of a new dry hydrant. Burland pond 3: construction of a new combined low-level outlet works and service spillway structure, and enlargement of the existing emergency spillway channel. The project also includes a raise of the existing dam embankment, construction of new downstream slope erosion protection, and construction of a new dry hydrant.
AvailableDam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
AvailableThis RFP is for dam rehabilitation, including new principal spillway construction.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
This RFP is for dam rehabilitation, including new principal spillway construction.
AvailableThe rehabilitation will address concrete cracking in the spillway and other structural deficiencies identified in recent safety inspections as well as provide additional outdoor recreational opportunities for the public to enjoy.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The rehabilitation will address concrete cracking in the spillway and other structural deficiencies identified in recent safety inspections as well as provide additional outdoor recreational opportunities for the public to enjoy.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis