Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Fire Adapted Bailey 's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Fire Adapted Bailey
The project generally consists of construction work at three ponds. Work at each pond is summarized as follows: burland pond 1: construction of a new combined low-level outlet works and service spillway structure, and construction of a new emergency spillway channel. The project also includes a raise of the existing dam embankment, and construction of a new dry hydrant. Burland pond 2: construction of a new low-level outlet works, and construction of a new emergency spillway training berm. The project also includes construction of a new toe drain system, and construction of a new dry hydrant. Burland pond 3: construction of a new combined low-level outlet works and service spillway structure, and enlargement of the existing emergency spillway channel. The project also includes a raise of the existing dam embankment, construction of new downstream slope erosion protection, and construction of a new dry hydrant.
Posted Date
Dec 26, 2025
Due Date
Feb 27, 2026
Release: Dec 26, 2025
Fire Adapted Bailey
Close: Feb 27, 2026
The project generally consists of construction work at three ponds. Work at each pond is summarized as follows: burland pond 1: construction of a new combined low-level outlet works and service spillway structure, and construction of a new emergency spillway channel. The project also includes a raise of the existing dam embankment, and construction of a new dry hydrant. Burland pond 2: construction of a new low-level outlet works, and construction of a new emergency spillway training berm. The project also includes construction of a new toe drain system, and construction of a new dry hydrant. Burland pond 3: construction of a new combined low-level outlet works and service spillway structure, and enlargement of the existing emergency spillway channel. The project also includes a raise of the existing dam embankment, construction of new downstream slope erosion protection, and construction of a new dry hydrant.
AvailableFire Adapted Bailey
The project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
Posted Date
Dec 26, 2025
Due Date
Feb 27, 2026
Release: Dec 26, 2025
Fire Adapted Bailey
Close: Feb 27, 2026
The project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.