CityNY
Posted
-
Nov 17, 2026
Oak Summit Road Over Sprout Creek Culvert Replacement RFP
Work consists of: 195 CY, unclassified excavation and disposal; 262 CY, embankment in place; 149 CY, select structure fill; 412 CY, structure excavation; 82 CY, trench and culvert excavation; 23 SY, prefabricated composite integral abutment drain; 440 SY, seed and mulch - temporary; 3361 LF, asphalt pavement joint adhesive; 45 SY, miscellaneous cold milling of bituminous concrete; 3728 lb, epoxy-coated bar reinforcement for structures. See attached file.
