Description: Culvert replacement project. The project includes, but is not limited to phased demolition of the existing CMP culvert, demolition of the existing road surface and sidewalk, bank stabilization and grading, dewatering, dredging, roadway grading, water main relocation, installation of a new 24' span 3-sided rigid frame bridge structure, installation of new HAM walkway and HMA berm, streambed restoration, roadway paving and other work, appurtenances, and incidental items.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Work includes consists of the removal of an existing bridge structure and culverts and construction of a 13'-7" x 4'-7" x 43'-6" long full invert aluminum box culvert with aluminum headwalls and wingwalls, backfilling, slope grading, erosion control, roadway excavation, asphalt paving, restoration, and associated work.
Removal of an existing concrete-encased steel beam bridge structure and the installation of a new, precast concrete box culvert and the adjustment of existing drainage swales to accommodate the new culvert.
From the first pre-RFP signals to the published RFP and its files.
Meeting agenda
195 days before RFP
Gardner pursued Community Culvert and MVP grant funding totaling $2,014,230 for replacement of the critical Keyes Road culvert with a full bridge over Wilder Brook.
See 2 sourcesHide sources
Keyes Road Culvert Replacement • Project Status: Community Culvert Grant Submitted, MVP Grant Application In Process • Amount: $2,014,230.00 $900,000.00 (Community Culvert Grant), $1,110,000.00 (MVP Grant) • Description: Construction for the replacement of the Keyes Road culvert into a full bridge that serves Wilder Brook and the 60+ household residential…
Economic and Community Development Committee Meeting Minutes
Keyes Road Culvert Replacement • Project Status: Community Culvert Grant Submitted, MVP Grant Application In Process • Amount: $2,014,230.00 $900,000.00 (Community Culvert Grant), $1,110,000.00 (MVP Grant) • Description: Construction for the replacement of the Keyes Road culvert into a full bridge that serves Wilder Brook and the 60+ household residential…
Economic and Community Development Committee Meeting Notice
The City’s Keyes Road Culvert project was selected for a full-scope Community Culvert Grant award of $2,014,855.25.
See sourceHide source
Grants (applied/necessary matching funds/ awarded or rejected): o Community Culvert Grant (CCG) (Due: January 9th, 2026) • Submission Status: Submitted on 1/5/26 • Requested Amount: 904,885.25 • Keyes Road Culvert (DEP#160-0657) • Awarded Status: Selected: Informed May 19th, 2026 • Award Amount: Full Scope: 2,014,855.25 • The Agent will work with associated…
City of Gardner Public Service Committee Public Service Committee Meeting
The City recorded that the funded Keyes Road culvert replacement was awarded to an engineering contractor for bidding and construction services.
See sourceHide source
Keyes Road Culvert Replacement Description: Construction for the replacement of the Keyes Road culvert into a full bridge that serves Wilder Brook and the 60+ household residential neighborhood that relies on the crossing as its only form of access to the rest of the City. The culvert is in critical condition and is at risk of failing and implementing a…
Economic and Community Development Committee Committee Update
Agenda packet · Sep 29, 2026
Board meeting
4 days before RFP
The City recorded a scheduled October 14 pre-bid sitewalk and October 29 bid opening for the grant-funded Keyes Road culvert replacement, with construction planned for next spring.
See sourceHide source
>> Keys Road replacement. >> So very happy to say that this project is is moving forward. The actual opening for the bid awards is October 29th. There is a pre-bid sitewalk which I believe is October 14th. Um I forget the time. you can look up with the purchasing department and contact with the purchasing department if anyone's listening and wants to uh put…
Gardner Economic and Community Development Committee Meeting
RFP published