Open RFP

Oak Summit Road Over Sprout Creek Culvert Replacement RFP

Description: Work consists of: 195 CY, unclassified excavation and disposal; 262 CY, embankment in place; 149 CY, select structure fill; 412 CY, structure excavation; 82 CY, trench and culvert excavation; 23 SY, prefabricated composite integral abutment drain; 440 SY, seed and mulch - temporary; 3361 LF, asphalt pavement joint adhesive; 45 SY, miscellaneous cold milling of bituminous concrete; 3728 lb, epoxy-coated bar reinforcement for structures. See attached file.

Buyer
Town of Washington

City · NY, US

Released
-
Closes
Nov 17, 2026(25 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts