CountyNY
Posted
Oct 23, 2026
Nov 25, 2026
Guide Board Road Culvert over Middle Brook RFP
Work include culvert replacement.
Description: Work involves replacing the existing culvert. The new structure will be a concrete box culvert with headwalls and wingwalls. Associated work includes temporary dewatering and waterway diversion, slope protection and streambank stabilization, guide rail and bridge rail installation, as well as restoration of pavement and turf surfaces.
City · NY, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
300 days before RFP
Wendel reported that the Baer Road culvert project was in the final stages of design.
WENDEL Reports Tim Walck, Wendel reported as follows: • Baer Rd. Culvert- in the final stages of design.
Town of Cambria Town Board Regular Meeting
Board meeting · Dec 11, 2025
Board meeting
118 days before RFP
Wendel reported that the project had a temporary construction easement after a permanent easement was unavailable, with construction deferred beyond that season.
WENDEL Reports Tim Walck-Wendel Engineers reported as follows: MS4 Requirements: • This is for the solar project. Wendel received plans in with the storm water pollution prevention plan and just completed the first review; waiting for additional information. Baer Rd. culvert: • One property owner was not willing to sign a permanent easement. Wendel worked…
Town Of Cambria Town Board Regular Meeting
Board meeting · Jun 11, 2026
Board meeting
90 days before RFP
The Town Board approved going to public bid for the Baer Road culvert replacement contingent on DOT approval, with construction planned for summer 2027.
Public Bidding -- Baer Road Culvert Project BE IT RESOLVED THAT, that the Town Board does hereby authorize going to public bid for the Baer Road culvert replacement project, contingent upon the DOT approving proceeding with the project. The Town Town of Cambria Town Board July 9, 2026 3 Supervisor, Town Attorney and Town Engineer will collaborate on setting…
Town of Cambria Regular Meeting
Board meeting · Jul 9, 2026
Board meeting
27 days before RFP
Wendel reported DOT approval to advertise the Baer Road culvert project, and the Town Board approved sending the bid for advertising with bids scheduled to open November 5, 2026.
WENDEL Reports Tim Walck, Wendel Engineers reported as follows: Baer Rd. culvert: Town of Cambria Town Board September 10, 2026 2 • Obtained DOT approval to go out to bid; Wendel is recommending advertising to go out to bid on October 8, 2026. It will be a 4-week bid period, opening the bids on November 5, 2026, at 11am. Wendel and the DOT need to review…
Town of Cambria Town Board Regular Meeting
Board meeting · Sep 10, 2026
RFP published
Proposals due (6 days left)
Adjacent opportunities open for bidding right now.
CountyNY
Posted
Oct 23, 2026
Nov 25, 2026
Work include culvert replacement.
Iowa Department of Transportation
State AgencyIA
Posted
-
Dec 15, 2026
Approx. 2,510.70 SY Bridge floor overlay; 50.60 SY bridge floor repair, class A; 40 CY embankment-in-place; 303.50 SY engineering fabric; 113.20 CY excavation class 10; 596.80 CY excavation class 13; 150 LF guardrail, formed steel beam; 1,448.10 SY longitudinal grooving in concrete. See attached files.
Georgia Department of Transportation
State AgencyGA
Posted
Nov 20, 2026
Dec 18, 2026
Georgia Department of Transportation seeks bids for construction of a bridge and approaches on Buck Gardner Road over Alpine Creek, covering 0.161 mile. The department’s project information describes a bridge replacement prompted by insufficient load-carrying capacity and deterioration to the abutments, piles, and deck. Bids are due December 18, 2026.
CityNY
Posted
Nov 19, 2026
Dec 17, 2026
Work includes removal of the existing culvert structure, installation of the new precast culvert structure, 165 ft of pavement reconstruction, rail installation, and approximately 120 ft of stream reconstruction.
Decision makers connected to this RFP from Town of Cambria.