Description: Select roof repairs. Repair front porch posts. Stucco and insulate exterior walls infilled in Phase 1. New windows at infilled walls. New entry door at rear wall of kitchen. Repoint stone foundation. Repair rear concrete slab. Repair exterior stucco. Prep and paint exterior. New HVAC system. New electrical service and panel. New fire detection system. Alternate #1: New cellar bulkhead doors.
City · NJ, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Township of Parsippany-Troy Hills.
These related opportunities are still open for bidding.
CityTX
Posted
Sep 4, 2026
Sep 21, 2026
The project includes scarifying, mixing, and reshaping the pavement surface and base material, removal of the top 6" of scarified asphalt and base, constructing a minimum 12" cement stabilized subgrade, and 1.5" Type D surface course over 4.5" Type B base course, along with all appurtenances.
Metropolitan Council - Twin Cities
State AgencyMN
Posted
Sep 8, 2026
Oct 8, 2026
Project consists of but not limited to approx. 1850 LF Silt Fence; 1850 LF Wood Mulch Berm; 5000 LF Filter Log/Biolog; 1640 CY Bossen Field Topsoil Excavation (EV); 1830 CY Topsoil Borrow (LV); 1640 CY Sodding, Lawn Type; 11440 SY Temp. Seed Mix; 9840 SY MNDOT Seed Mix Type Residential Turfgrass; 21300 SY Hydromulch; 10450 TN Haul Regulated Fill to Landfill; 1000 CY Stockpile Soil For Testing (EV); 6550 CY Haul Unsuitable, Clean Fill for Offsite Disposal (EV); see Bid Schedule (p320) for more details.
CountyPA
Posted
Sep 4, 2026
Oct 1, 2026
Taxiway A Rehabilitation.
CityPA
Posted
Sep 6, 2026
Oct 15, 2026
The project is for bridge and culvert rehabilitation at six locations. The work includes, but is not limited to, masonry cleaning and selective repointing; selective concrete replacement; inlet opening modifications; concrete underpinning; stabilization using shotcrete; scour infill with rip rap; bank stabilization; guiderail modifications and stabilization; temporary erosion and sediment control measurers; temporary stormwater bypass; and site restoration.