Bridgefarmer Road Rehabilitation (Phase 3 Highridge Farms To Dowdy Rd.) RFP
Posted
Sep 4, 2026
Sep 21, 2026
The project includes scarifying, mixing, and reshaping the pavement surface and base material, removal of the top 6" of scarified asphalt and base, constructing a minimum 12" cement stabilized subgrade, and 1.5" Type D surface course over 4.5" Type B base course, along with all appurtenances.