Airport Taxiway "F" Realignment Phase 1
Work consist of 117. 5 cy of grouted riprap apron w/geosynthetic filter fabric, 2. 4 cy of grouted riprap slope protection w/geosynthetic filter, 1 ea of remove and salvage fire hydrant assembly, 1 ea of remove and salvage fire hydrant assembly, cap abandoned pipe ends to remain, 50 lf of remove asbestos cement pipe, 36 lf of 6" fire line w/fittings, dip cl 350, 2 ea of install new fire hydrant assembly, 1 ea of adjust electrical/communication pullbox frame and cover to grade w/12-inch box extension, 799 lf of 3" spare duct. See attached file.