CityCA
Posted
Oct 23, 2026
Nov 20, 2026
Transit Maintenance Facility Maintenance Floor Recoating RFP
The work of this project includes having approx 12,000 SF of the existing floor coating completely removed to the subsurface concrete, coating the exposed concrete with builtin moisture control system, and applying a new high strength/high traffic epoxy coating with non-slip grit in the same incumbent pattern.
