CityCA
Aug 19, 2026
Closes
Sep 22, 2026
Construct Plaza Park Pedestrian Bridge
Work includes approx 1 LS clearing and grubbing; 522 SF 4" sidewalk (concrete); 4 EA swing gate lockable bollard.
Description: Work includes approx 1 LS clearing and grubbing; 522 SF 4" sidewalk (concrete); 4 EA swing gate lockable bollard.
City · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityCA
Aug 19, 2026
Closes
Sep 22, 2026
Work includes approx 1 LS clearing and grubbing; 522 SF 4" sidewalk (concrete); 4 EA swing gate lockable bollard.
CityAR
-
Closes
Sep 14, 2026
Provide labour and material for pedestrian bridge.
CityIN
Aug 6, 2026
Closes
Aug 26, 2026
Work includes pedestrian bridge rehab.
CityIL
Aug 13, 2026
Closes
Sep 2, 2026
The Town of Normal is soliciting sealed bids for the Linden Street Pedestrian Bridge on the Constitution Trail crossing over Linden Street in Normal, Illinois. The posting describes a procurement rather than a grant and calls for removal and replacement of the existing pedestrian bridge, including its abutments and foundations, with a prefabricated steel truss bridge of similar span and profile, plus incidental work shown in the plans. It lists a non-mandatory pre-bid meeting on Tuesday, August 25, 2026 at 1:30 PM and a bid deadline of Wednesday, September 2, 2026 at 11:00 AM.
Procurement and program contacts connected to City of Visalia.