The Regents of the University of Michigan
Higher EducationMI
Jul 16, 2026
Closes
Aug 12, 2026
Palmer Commons - Second and Third Floor Renovation RFP
Second and Third Floor Renovation, Bidpack 01 - Construction.
Description: The City of Olympia is soliciting sealed bids from contractors for the City Hall Second Floor Improvements project (Project Number PRJ-25-000263), which involves tenant improvements to a portion of the second floor of Olympia City Hall. The scope includes enclosing an existing open office area to create new offices, a conference room, a restroom, and a staff break room, along with modifications to the existing HVAC system, fire alarm, fire sprinkler, electrical, and lighting systems, with an Engineer's Probable Opinion of Cost ranging from $440,000 to $540,000. A non-mandatory pre-bid meeting is scheduled for July 14, 2026, at 8:30 AM at Olympia City Hall, and sealed bids must be submitted through the Trimble Unity Construct online Bid Portal by July 28, 2026, at 11:00 AM, at which time they will be publicly read at Olympia City Hall (601 4th Avenue East, Olympia, Washington 98501).
City · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Olympia.
These related opportunities are still open for bidding.
The Regents of the University of Michigan
Higher EducationMI
Jul 16, 2026
Closes
Aug 12, 2026
Second and Third Floor Renovation, Bidpack 01 - Construction.
CityOH
Aug 1, 2026
Closes
Aug 17, 2026
Work includes hall entrance improvements project.
CityNY
Jul 22, 2026
Closes
Aug 12, 2026
Project consists of the following: base bid for the installation of two concrete curb ramps within the NYSDOT highway right of way and associated restoration. An add alternate bid consists of the demolition and installation of concrete stairs, concrete ramp, and associated railings at the town hall.
CityCA
May 20, 2026
Closes
Aug 13, 2026
First floor - renovation of a storage area into a new breakroom and dispatch area with new updated led lighting, two gender neutral restrooms (one which meets ada standards), a new kitchenette, a new dispatch window area, relocated dispatch mailboxes, refinished concrete floors, and window storefronts. Second floor - renovation of common spaces with a new landing facade wall with tv display, updated drinking fountain, repolished concrete floors, updated led lighting, wall cabinetry for added storage, and updated outlets with usb fixtures, new private office, new kitchen layout with proper fixtures, new exhaust fans at all restrooms, new open office with cubicles, new carpet, paint, acoustics at existing offices. Exterior - provide new exterior aluminum storefront system with tempered glass, new aluminum storefront door and door hardware.