CountyVA
Posted
Sep 5, 2026
Nov 17, 2026
Proctors Creek WWTP Coagulant Facility Improvements and Sidestream Treatment
Demolition of the unused Dissolved Air Flotation (DAF) building, construction of new brick and mortar coagulant facility building on the former DAF building site to house coagulant metering pumps, lime slurry metering pumps, and associated electrical equipment. Bulk storage tanks will be stored in an outdoor concrete containment area adjacent to the brick and mortar coagulant facility building. Construction of new Sidestream Treatment Facility at existing Proctors Creek Wastewater Treatment Plan consisting of: Demolition of existing Gravity Belt Filter Building and associated utilities, construction of new Centrate Equalization basin and associated pumps, filters, equipment and appurtenances. Conversion of existing Centrate Equalization Basin to a de-ammonification Reactor, with associated vertical mixer, access walkway, effluent structure, blowers and blower canopy. Construction of new pre-engineered concrete Electrical Support Building for housing electrical drives and equipment, including Micro-nutrient chemical feed room
