Special DistrictOH
Posted
Jul 23, 2026
Sep 21, 2026
Western Water Company Treatment Plant Expansion and Wellfield Improvements RFP
The proposed work is generally described as follows: expand the existing water treatment building to house an additional softening treatment train, which includes a horizontal pressure filter and a vertical ion exchange softener. Install a new brine tank to supply the ion exchange softener. Excavate and remove the existing underground brine backwash tanks and replace with a backwash lagoon. The wellfield improvements include a new booster pump station, and the development of one new well. Piping, electrical, lighting, instrumentation, and control upgrades, are also included in the project scope.