CityMS
Posted
Aug 26, 2026
Sep 29, 2026
Chickasaw Heritage Center Natchez Trace Intersection
Work inlcudes construction of an access drive intersection, earthwork, storm drainage, base construction, paving, and striping.
Description: Work inlcudes construction of an access drive intersection, earthwork, storm drainage, base construction, paving, and striping.
City · MS, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Tupelo.
Adjacent opportunities open for bidding right now.
CityMS
Posted
Aug 26, 2026
Sep 29, 2026
Work inlcudes construction of an access drive intersection, earthwork, storm drainage, base construction, paving, and striping.
Special DistrictNY
Posted
Aug 31, 2026
Sep 24, 2026
Dark trace renewal. Provide continued software upgrades and patches as well as technical support and security subscriptions for intelligence feeds. The dark trace solution provides real-time data collection and analysis or all data entering and exiting the internet and select OT segments.
CityIL
Posted
Sep 4, 2026
Sep 29, 2026
Performed consists of roadway widening, curb and gutter removal and replacement, concrete median installation, sidewalk installation, and all incidental and collateral work necessary to complete the improvement.
CityVA
Posted
Aug 18, 2026
Sep 23, 2026
Work includes 200 SY of pavement cut and removal, 200 SY of asphalt concrete base, type bm25 (a or d) (4" compacted layer) (pavement repair or street rehab), 220 Ton asphalt concrete pave. Type sm-12. 5a, 740 SY pavement profiling, 6 EA valve box replacement, 38 LF new concrete curb, vdot std. Cg-2, 8 SY replacement concrete sidewalk 4" thick), 5 ea existing manhole grade adjustment, erosion and sediment control, 3,500 SY asphalt removal (chipping), and 200 SY reinstall belgium block with polymeric sand.