CountyAL
Posted
Aug 21, 2026
Sep 23, 2026
John Paul Road & Natchez Trace Road Phase I & II
John Paul Road & Natchez Trace Road Phase I & II.
Description: Work inlcudes construction of an access drive intersection, earthwork, storm drainage, base construction, paving, and striping.
City · MS, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyAL
Posted
Aug 21, 2026
Sep 23, 2026
John Paul Road & Natchez Trace Road Phase I & II.
Oklahoma Department of Transportation
State AgencyOK
Posted
Apr 22, 2020
Sep 17, 2026
Intersection modification. Work includes 1 LS clearing and grubbing; 3,668 CY of unclassified excavation; 11,138 SY of solid slab sodding; 2,928 CY of type A aggregate base; 3,400 SY of cold milling pavement; 367 SY of 4" concrete sidewalk; 172 SY of 6" concrete driveway; 20 SF of new tactile warning device; 1 EA 5' dia manhole; 379 LF of 18" Cl III RC pipe; 4,649 LF of sawing pavement; 100 LF of 54" jack and bore steel casing; 27 LF of 6" PVC pipe; 60 LF of 8" PVC water line pipe; 657 LF of 10" PVC pipe; 872 LF of 12" PVC pipe; 1,413 LF of 16" PVC pipe; 45 LF of 18" PVC pipe; 897 LF of 24" PVC pipe; 205 LF of 36" PVC water line; 1 EA 2" meter installation; 3 EA fire hydrant and assembly; 100 LF of 16" bore and jack casing; 252 LF of 8" directional bore; 124 LF of 10" directional bore; 19 LF of 14" directional bore; 184 LF of 16" directional bore; 17 LF of 30" directional bore; 511 LF of 36" directional bore; 4 EA short service connection; 11 LF of 2" HDPE pipe; 367 LF of 8" HDPE pipe; 124 LF of 10" HDPE pipe; 511 LF of 36" HDPE pipe; 4 EA roadway luminaire; pavement markings. See attached file.
Oklahoma Department of Transportation
State AgencyOK
Posted
-
Sep 10, 2026
Approx. 1 LS Clearing and grubbing; 3,999 CY unclassified excavation; 1,860 AC vegetative mulching; 14,746 SY cold milling pavement; 3,730 LF sawing pavement; 500 LF beam guardrail w-beam single. Project length = 0.522 mi. See attached file and outside link.
CityPA
Posted
Aug 14, 2026
Sep 14, 2026
Installation of an electrical distribution system, traffic signal support foundations, ADA curb ramps and pavement markings in support of a modernized traffic signal at the project intersection.
Decision makers connected to this RFP from City of Tupelo.