Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
NYC Transit Bid Desk
Removing glass blocks, granite pavement, concrete slabs, and bollards at the street level; repairing sculpture mounted vertical art panels, removing and replacing electric lighting fixtures, repairing or replacing steel beams and concrete walls, reinstalling existing automated fare control systems, and painting columns and beams at the mezzanine level; repairing or replacing drip pan steel structure or concrete slabs on the roof of the southbound tracks and repairing all structural defects in the concrete and steel framing of all ventilator components on the southbound and northbound tracks. The Work also includes temporarily relocating, protecting, and reinstalling all affected communications and electrical systems to facilitate the Work, abandoning the existing snow melt system, and removing existing lighting systems and installing new normal and emergency (600V DC, 4-hour battery backup) LED lighting systems with associated conduits and wiring.
Posted Date
Jun 9, 2026
Due Date
Jul 23, 2026
Release: Jun 9, 2026
NYC Transit Bid Desk
Close: Jul 23, 2026
Removing glass blocks, granite pavement, concrete slabs, and bollards at the street level; repairing sculpture mounted vertical art panels, removing and replacing electric lighting fixtures, repairing or replacing steel beams and concrete walls, reinstalling existing automated fare control systems, and painting columns and beams at the mezzanine level; repairing or replacing drip pan steel structure or concrete slabs on the roof of the southbound tracks and repairing all structural defects in the concrete and steel framing of all ventilator components on the southbound and northbound tracks. The Work also includes temporarily relocating, protecting, and reinstalling all affected communications and electrical systems to facilitate the Work, abandoning the existing snow melt system, and removing existing lighting systems and installing new normal and emergency (600V DC, 4-hour battery backup) LED lighting systems with associated conduits and wiring.
AvailableNYC Transit Bid Desk
Work include furnishing all tennant replacement components for multiple equipment models, with full part details available in the accompanying excel list, which includes but is not limited to brushes, filters, blades, batteries, hoses, and hardware
Posted Date
May 28, 2026
Due Date
Jun 23, 2026
Release: May 28, 2026
NYC Transit Bid Desk
Close: Jun 23, 2026
Work include furnishing all tennant replacement components for multiple equipment models, with full part details available in the accompanying excel list, which includes but is not limited to brushes, filters, blades, batteries, hoses, and hardware
AvailableNYC Transit Bid Desk
Design-Build Services for Fresh Pond Yard Bridge Replacement and Track Re-Configuration.
Posted Date
May 18, 2026
Due Date
Jun 18, 2026
Release: May 18, 2026
NYC Transit Bid Desk
Close: Jun 18, 2026
Design-Build Services for Fresh Pond Yard Bridge Replacement and Track Re-Configuration.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge