Lake Johnson Principal Spillway Repairs RFP
Work includes construction entrance, laydown area temporary facilities 2 LS, demolition and fence removal 2.04 LS, vegetation removal, ogee central vertical monolith joint repair 2.06 LF, ogee/training wall abutment joint repair 2.07 LF, ogee/spillway horizontal 2.08 LF, upstream apron crack repair 2.09 LF, upstream apron joint repair 2.1 LF, upstream apron concrete repair 2.11 CY, lower spillway chute slab vertical joint repair 2.12 LF, training wall slab joint repair 2.12 LF, fence gate 2.14 LF, optional: replace remaining north side fencing 2.16 LF. See attached file.