Oregon Department of Human Services
State AgencyOR
Aug 6, 2026
Closes
Aug 20, 2026
Vegetables Frozen, Assorted - S-29100-00017692
Provide 120000 Pounds Vegetables Green Beans.
Description: The Oregon Department of Corrections (DOC) solicits bids for CDC Building 2 Stair Improvements at the CDC facility located at 3601 State Street, Salem, OR 97301. The work includes replacement and construction of steel stair stringers, steel pan treads, concrete treads and landings, landing beams, posts, ledgers, and related connections; a mandatory pre-bid conference is scheduled for 2026-08-27 at 09:00 AM (PST) at the CDC site. Bids are due by the bid opening on 2026-09-24 at 02:00 PM per the buyer posting; file attachments (plans/specs/SOW) are available on the OregonBuys posting.
StateAgency · OR, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Oregon Department of Human Services
State AgencyOR
Aug 6, 2026
Closes
Aug 20, 2026
Provide 120000 Pounds Vegetables Green Beans.
Special DistrictTN
Aug 4, 2026
Closes
Sep 8, 2026
Provide administration building exterior stair replacement.
Special DistrictIL
Aug 6, 2026
Closes
Aug 17, 2026
Work includes, but is not limited to, structural repairs, interior renovations, mechanical, electrical, and plumbing upgrades, accessibility enhancements, and site improvements.
Washington State Department of Enterprise Services
State AgencyWA
Jul 28, 2026
Closes
Aug 28, 2026
This open Request for Quotation seeks a qualified architectural firm to provide pre-design services and, conditionally, full design, construction support, and oversight for renovations to Building 11 at Tacoma Community College. The work includes validating scope and budget, redesigning common areas, and upgrading lighting, audiovisual systems, restrooms, and student-focused spaces, with a maximum allowable construction cost of $2.8 million. The two-phase selection process requires a written statement of qualifications followed by oral interviews, with submissions due August 28, 2026.
Procurement and program contacts connected to Oregon Department of Corrections.