Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Minneapolis issued an RFx titled 'BID-PW-Clay Sanitary Sewer Pipe' (Event ID 0000004008) to procure sanitary sewer pipe work. The solicitation was posted on 2026-01-14 and bids are due on 2026-01-28; the opportunity is listed as an informal RFx (Sell) and has an estimated value range of $100,000 - $500,000 per aggregator estimate. The official posting is on the City's eSupplier/COMET procurement system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work of the contract includes the rehabilitation of sanitary sewers and manholes. Rehabilitation measures will also require maintenance and control of traffic as specified in the contract drawings. Surveying of sanitary sewers and manholes via closed-circuit television (cctv) is required before and after construction is completed. Work also includes 1 LS erosion and sedimentation control measures; 1 LS runway and taxiway closure, restoration, and reopening including temporary construction items; 1 LS sewer bypass - area 1 - pumped bypass; 2 CY rock and obstruction excavation, all depths. See attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
Work of the contract includes the rehabilitation of sanitary sewers and manholes. Rehabilitation measures will also require maintenance and control of traffic as specified in the contract drawings. Surveying of sanitary sewers and manholes via closed-circuit television (cctv) is required before and after construction is completed. Work also includes 1 LS erosion and sedimentation control measures; 1 LS runway and taxiway closure, restoration, and reopening including temporary construction items; 1 LS sewer bypass - area 1 - pumped bypass; 2 CY rock and obstruction excavation, all depths. See attached file.
Available860 LF of 6" VCP pipe burst to 8" HDPE, 1840 LF of 8" VCP pipe burst to 10" HDPE, 975 LF of 10" VCP pipe burst to 12" HDPE, Demolition of existing manholes, 15 New cast in place manholes, Connection of existing services, Pre & Post CCTV inspection.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
860 LF of 6" VCP pipe burst to 8" HDPE, 1840 LF of 8" VCP pipe burst to 10" HDPE, 975 LF of 10" VCP pipe burst to 12" HDPE, Demolition of existing manholes, 15 New cast in place manholes, Connection of existing services, Pre & Post CCTV inspection.
AvailableThis RFP is for sanitary sewer point repairs, manhole construction, manhole rehabilitation, CCTV inspection, and asphalt pavement restoration.
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
This RFP is for sanitary sewer point repairs, manhole construction, manhole rehabilitation, CCTV inspection, and asphalt pavement restoration.
AvailableReplacing-in-place approx. 1900 LF of 18", and 775 LF of 20" PVC pipe sanitary sewer main. The installation of 1150 LF of 8" PVC pipe sanitary sewer main; including 15 manhole structures, by-pass pumping system and all other necessary and required appurtenances.
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
Replacing-in-place approx. 1900 LF of 18", and 775 LF of 20" PVC pipe sanitary sewer main. The installation of 1150 LF of 8" PVC pipe sanitary sewer main; including 15 manhole structures, by-pass pumping system and all other necessary and required appurtenances.