Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
860 LF of 6" VCP pipe burst to 8" HDPE, 1840 LF of 8" VCP pipe burst to 10" HDPE, 975 LF of 10" VCP pipe burst to 12" HDPE, Demolition of existing manholes, 15 New cast in place manholes, Connection of existing services, Pre & Post CCTV inspection.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project consist of approx 1,860 LF 8" HDPE sanitary sewer pipe via pipe bursting or/and open cut; 285 LF 8" HDPE rehabilitate sanitary sewer pipe via directional boring; 6 EA 4" furnish and install sanitary sewer service line (short side); 2,150 LF pre and post-installation tv inspection; 250 LF refurbish existing sanitary sewer manhole utilizing a liner product that must be approved by the Engineer; 3 EA reinforced concrete sanitary sewer manhole.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
The project consist of approx 1,860 LF 8" HDPE sanitary sewer pipe via pipe bursting or/and open cut; 285 LF 8" HDPE rehabilitate sanitary sewer pipe via directional boring; 6 EA 4" furnish and install sanitary sewer service line (short side); 2,150 LF pre and post-installation tv inspection; 250 LF refurbish existing sanitary sewer manhole utilizing a liner product that must be approved by the Engineer; 3 EA reinforced concrete sanitary sewer manhole.
AvailableThe City of Minneapolis issued an RFx titled 'BID-PW-Clay Sanitary Sewer Pipe' (Event ID 0000004008) to procure sanitary sewer pipe work. The solicitation was posted on 2026-01-14 and bids are due on 2026-01-28; the opportunity is listed as an informal RFx (Sell) and has an estimated value range of $100,000 - $500,000 per aggregator estimate. The official posting is on the City's eSupplier/COMET procurement system.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
The City of Minneapolis issued an RFx titled 'BID-PW-Clay Sanitary Sewer Pipe' (Event ID 0000004008) to procure sanitary sewer pipe work. The solicitation was posted on 2026-01-14 and bids are due on 2026-01-28; the opportunity is listed as an informal RFx (Sell) and has an estimated value range of $100,000 - $500,000 per aggregator estimate. The official posting is on the City's eSupplier/COMET procurement system.
AvailableWork includes approx. 74 lf of 8" sanitary sewer pipe (open cut); 10 LF of 10" Sanitary sewer pipe, (open cut); 105 LF of 15" Trenchless construction; 3,481 LF of CCTV inspection (pre-construction); 5 EA of (4' dia) sanitary sewer manhole (0 - 6 ft). See outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
Work includes approx. 74 lf of 8" sanitary sewer pipe (open cut); 10 LF of 10" Sanitary sewer pipe, (open cut); 105 LF of 15" Trenchless construction; 3,481 LF of CCTV inspection (pre-construction); 5 EA of (4' dia) sanitary sewer manhole (0 - 6 ft). See outside link.
AvailableWork includes : 1 LS gravity sewer line and manhole testing; 6,300 LF post construction cctv inspection; 70 LF 20-in steel encasement by open cut with pipe supports; 50 LF 8" sdr 26 pvc sanitary sewer line; see attached file.
Posted Date
Jan 22, 2026
Due Date
Feb 24, 2026
Release: Jan 22, 2026
Close: Feb 24, 2026
Work includes : 1 LS gravity sewer line and manhole testing; 6,300 LF post construction cctv inspection; 70 LF 20-in steel encasement by open cut with pipe supports; 50 LF 8" sdr 26 pvc sanitary sewer line; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis