CityMN
Aug 5, 2026
Closes
Aug 31, 2026
Sherin Park Campground Bathhouse Demolition and Construction Project RFP
Demolition (optional) of the existing campground bathhouse and the construction of a new campground bathhouse.
Description: Building 12 Demolition Project.
City · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMN
Aug 5, 2026
Closes
Aug 31, 2026
Demolition (optional) of the existing campground bathhouse and the construction of a new campground bathhouse.
Crawford County Industrial Development Authority
Special DistrictPA
-
Closes
Aug 27, 2026
The Economic Progress Alliance of Crawford County (EPACC) is soliciting bids for the demolition of Building 1-6 at the Crawford Business Park located at 13518 Broadway Drive, Meadville, PA 16335 in Vernon Township, Crawford County, Pennsylvania. The project involves complete demolition of a six-story building of approximately 138,900 square feet plus a partial basement, along with utility disconnections, demolition of abandoned storage tank containment areas, foundations, support structures, site clearing, grubbing, grading, and the construction of approximately 500 linear feet of 10-inch ductile iron fire line. Bids must be submitted to EPACC offices at 798 Bessemer Street, Meadville, PA 16335 by 2:00 PM prevailing time on Thursday, August 27, 2026, with a pre-bid conference held at the site on Wednesday, August 12, 2026, at 2:00 PM.
CityNY
Jul 16, 2026
Closes
Aug 11, 2026
The Village of Scarsdale is soliciting sealed proposals from qualified contractors for the demolition of the non-operational sanitation incinerator building located at 110 Secor Road, Scarsdale, NY 10583. Bidding documents must be obtained exclusively through BidNet Direct, which is the designated location and means for distributing and obtaining all bid documents for the Village. Sealed proposals will be received by the Office of the Village Clerk until 2:00 PM on Tuesday, August 11, 2026, after which they will be publicly opened and read aloud.
CityNV
Aug 5, 2026
Closes
Aug 27, 2026
Work will include but not be limited to the complete removal of all materials associated with the existing pool area and pool building. Including removal and hauling off of all materials and rough grading. The work also includes contractor coordination with all existing utilities, both dry and wet, associated with the demolition of the existing structures. The contractor will be solely responsible for the safe removal and or relocation of all existing utilities.
Procurement and program contacts connected to Town of Hingham.