Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Crawford County Industrial Development Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Crawford County Industrial Development Authority
Work includes removal and disposal of regulated asbestos-containing material (racm) consisting of pipe/boiler insulation, window caulking and glazing, wall/ceiling and compressor insulation, ductwork insulation, floor debris, and rope; universal waste consisting of fluorescent light tubes, high intensity discharge (hid) bulbs, thermostats, thermometers, etc; and other hazardous/regulated materials including fluorescent light fixtures/ballasts, numerous storage drums/containers, and fire extinguishers. The building includes a total floor plan area of approx 138,900 SF and contains six stories with each story covering approx 23,150 SF and a partial basement.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Crawford County Industrial Development Authority
Close: Feb 6, 2026
Work includes removal and disposal of regulated asbestos-containing material (racm) consisting of pipe/boiler insulation, window caulking and glazing, wall/ceiling and compressor insulation, ductwork insulation, floor debris, and rope; universal waste consisting of fluorescent light tubes, high intensity discharge (hid) bulbs, thermostats, thermometers, etc; and other hazardous/regulated materials including fluorescent light fixtures/ballasts, numerous storage drums/containers, and fire extinguishers. The building includes a total floor plan area of approx 138,900 SF and contains six stories with each story covering approx 23,150 SF and a partial basement.
AvailableCrawford County Industrial Development Authority
Project includes the complete installation of a waste storage, roof and covers, dripline drain/ gutters, access road, concrete heavy use area protection, underground outlet, foundation drain, confinement fence, drop boxes, concrete aprons, trails and walkway, livestock pipeline, fencing, and watering facility.
Posted Date
Aug 18, 2025
Due Date
Sep 23, 2025
Release: Aug 18, 2025
Crawford County Industrial Development Authority
Close: Sep 23, 2025
Project includes the complete installation of a waste storage, roof and covers, dripline drain/ gutters, access road, concrete heavy use area protection, underground outlet, foundation drain, confinement fence, drop boxes, concrete aprons, trails and walkway, livestock pipeline, fencing, and watering facility.
Crawford County Industrial Development Authority
Bessemer building south end renovations - plumbing construction.
Posted Date
Jul 14, 2025
Due Date
Aug 8, 2025
Release: Jul 14, 2025
Crawford County Industrial Development Authority
Close: Aug 8, 2025
Bessemer building south end renovations - plumbing construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.