Special DistrictTX
Posted
-
Oct 15, 2026
Air Scour A Replacement at Thomas S Mackey Water Treatment Plant RFP
Work of the contract is for the construction of the air scour a replacement. Work consists of modifications to the existing air scour system to replace air scour blower a, establish independent electrical feeds for air scour blowers a and b, relocate existing air scour b control equipment, install the new air scour a control system, and perform associated mechanical, civil, electrical, instrumentation, controls, demolition, restoration, testing, startup, and commissioning work.