Boothbay Region Water District
Special DistrictME
Posted
-
Oct 7, 2026
Backwash Water Recycle Project
The project includes the construction of a sedimentation/equalization tank and construction of sludge drying beds with recycle return, sludge wasting and supernatant return pumps and piping, controls, chemical injection and electrical and SCADA upgrades for backwash water recycling.
