Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Adairsville
Seeking to retain the services of professional engineering firms for on call services.
Posted Date
Feb 26, 2026
Due Date
Mar 30, 2026
Release: Feb 26, 2026
City of Adairsville
Close: Mar 30, 2026
Seeking to retain the services of professional engineering firms for on call services.
AvailableCity of Adairsville
Purchase and installation of an automatic backup generator to power the Water Plant. This project will include the install of a new 500KW diesel backup generator system at the Water Plant. The selected company will purchase, provide and install all components needed to install and enclose a new 500KW diesel generator. Generator would be installed on a concrete slab with a level 1 metal sound enclosure. System also includes 2500-gallon fuel tank with rupture basin. Contractor will be responsible for the following: 1. Build a foundation for metal enclosure provided by contractor for the 500KW diesel generator. Proposal would include excavation, re-compacting, and pouring slab. 2. Install a 500KW, 480/277v/3-phase Diesel Generator in Weather-Proof Sound Enclosure with 2500-gallon tank. 3. Provide a crane to unload and set the 500 KW generator. 4. Provide electrical conduits and wiring from generator to existing automatic transfer switch. 5. Start-up and testing of system after installation. 6. Provide training for system use.
Posted Date
-
Due Date
Mar 6, 2026
Release: -
City of Adairsville
Close: Mar 6, 2026
Purchase and installation of an automatic backup generator to power the Water Plant. This project will include the install of a new 500KW diesel backup generator system at the Water Plant. The selected company will purchase, provide and install all components needed to install and enclose a new 500KW diesel generator. Generator would be installed on a concrete slab with a level 1 metal sound enclosure. System also includes 2500-gallon fuel tank with rupture basin. Contractor will be responsible for the following: 1. Build a foundation for metal enclosure provided by contractor for the 500KW diesel generator. Proposal would include excavation, re-compacting, and pouring slab. 2. Install a 500KW, 480/277v/3-phase Diesel Generator in Weather-Proof Sound Enclosure with 2500-gallon tank. 3. Provide a crane to unload and set the 500 KW generator. 4. Provide electrical conduits and wiring from generator to existing automatic transfer switch. 5. Start-up and testing of system after installation. 6. Provide training for system use.
City of Adairsville
Work includes rehabilitation of a gravity sewer main, pressure grouting and CIPP lining of approx 335 LF of 12" DIP gravity sewer main, in which 100 LF are located within CSX right-of-way, access will be provided through two existing manholes situated outside of the CSX right-of-way, rehabilitation of two existing sanitary sewer manholes.
Posted Date
-
Due Date
Feb 13, 2026
City of Adairsville
Close: Feb 13, 2026
Work includes rehabilitation of a gravity sewer main, pressure grouting and CIPP lining of approx 335 LF of 12" DIP gravity sewer main, in which 100 LF are located within CSX right-of-way, access will be provided through two existing manholes situated outside of the CSX right-of-way, rehabilitation of two existing sanitary sewer manholes.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Only if your solution is truly proprietary and you’re the exclusive distributor—work with the department head on a justification, then route to the city attorney and City Council for approval; expect this to be rare.
Coops: Coops aren’t used today—if asked for options, mention Georgia DOAS Statewide Contracts, Sourcewell, OMNIA Partners (Public Sector), and HGACBuy.
City of Adairsville is extremely reluctant to use sole source. Deprioritize this path and prepare for competitive bids.
Board meetings and strategic plans from City of Adairsville
The council meeting focused on the enactment of Resolution #2026-007, which established a temporary emergency moratorium on the establishment of new convenience stores, gas stations, and other businesses that provide bona fide coin-operated amusement devices.
The board convened for a work session and formally adjourned the meeting.
The primary discussion item documented was the adjournment of the work session. The motion to adjourn was made and seconded, passing unanimously.
The meeting commenced with the unanimous approval of the agenda. The primary procedural action involved motions to adopt the minutes from both the December 9th, 2025 Work Session and the December 11th, 2025 Council Meeting. Following these procedural items and confirmation that no citizens wished to speak, the meeting was adjourned.
The primary discussion point addressed the withdrawal of a specific agenda item, which was successfully approved by a 5-0 vote. Following this action, a motion to adjourn the meeting was carried by a 5-0 vote, concluding the proceedings.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Adairsville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database