CityCA
Posted
Jul 23, 2026
Sep 10, 2026
2027 Local Streets ADA Curb Ramps
Work includes 9,100 SF of asphalt concrete removal and replacement (revocable); 2,600 LF of remove & replace concrete curb & gutter (include base)(revocable); 1,000 SF of remove & replace concrete v-valley gutter and/or valley gutter pan (revocable); 10,750 SF of remove & replace concrete sidewalk (include base)(revocable); 8,000 SF of remove parkstrip & backfill with soil (revocable); 336 EA of concrete curb ramp with detectable warning (r-10, r-11 or modified) (include base); 1 EA of install detectable warning (wet set) on concrete curb ramp (revocable); 500 SF of install detectable warning on porkchop island walkway (revocable); etc, see outside link.