Closing soon

Abiquiu Hydroelectric Power Plant Crane Replacement (Request for Proposals/Qualifications)

Description: Seeking a qualified Contractor to furnish and install two new overhead hoist cranes that sit on a stationary structure. The existing cranes are rated approx. two tons each and are inadequate for the lifting requirements associated with operation of the PRV gates. Each crane provides lifting support for one of the two gates, which are not lifted simultaneously. The project will replace the existing cranes with two new cranes, each rated for five tons.

Buyer
Los Alamos County

County · NM, US

Released
Oct 19, 2026
Closes
Nov 17, 2026(9 days left)