CityWY
Posted
Sep 23, 2026
Oct 15, 2026
Moorcroft No. 1 Well Abandonment
Works include approx. 1 LS inspection of moorcroft no. 1 well; 1 LS remove moorcroft no. 1 well equipment; 5 CY abandon moorcroft no. 1 well casing.
Description: The City of Baker is soliciting bids to permanently abandon the existing Mississippi Street water well, including safe decommissioning and removal of associated equipment. The work includes well casing removal, pump and motor extraction, sediment control, approved backfill, and site restoration in accordance with applicable regulations. The contractor must complete the work within 60 calendar days after notice to proceed and provide the required bid, performance, and payment bonds and other certifications.
City · LA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Baker.
Adjacent opportunities open for bidding right now.
CityWY
Posted
Sep 23, 2026
Oct 15, 2026
Works include approx. 1 LS inspection of moorcroft no. 1 well; 1 LS remove moorcroft no. 1 well equipment; 5 CY abandon moorcroft no. 1 well casing.
CityCA
Posted
Sep 23, 2026
Oct 19, 2026
The City of Santa Barbara seeks a qualified contractor to abandon and demolish the Vera Cruz well and vault, perform well perforation and pressure grouting, remove associated utilities, and restore the site. The work includes demolition, a down-hole video survey, casing perforation and grouting, utility abandonment, sidewalk and curb restoration, and final documentation. The project requires bid, performance, and payment bonds, prevailing-wage compliance, and completion within 30 calendar days after the Notice to Proceed; late completion carries $500-per-day liquidated damages.
CityCA
Posted
Sep 23, 2026
Oct 19, 2026
The City of Santa Barbara seeks a qualified contractor to abandon and demolish the Vera Cruz well and vault, perform well perforation and pressure grouting, remove associated utilities, and restore the site. The work includes demolition, a down-hole video survey, casing perforation and grouting, utility abandonment, sidewalk and curb restoration, and final documentation. The project requires bid, performance, and payment bonds, prevailing-wage compliance, and completion within 30 calendar days after the Notice to Proceed; late completion carries $500-per-day liquidated damages.
CityOH
Posted
Aug 10, 2026
Oct 22, 2026
Work will include the removal and abandonment of the existing underground utilities. Approximately 2,850 feet of existing utilities will be abandoned with fcdf and approximately 2,375 feet of existing utilities will be completely removed. Minor grading will be required to provide positive drainage upon completion of existing utility abandonment and removal. Additionally the existing clear well will be removed to one (1) foot below grade and filled with compacted granular backfill.