Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Texas A&M University System, on behalf of Tarleton State University, is soliciting statements of qualifications from A/E firms to design Parking Structure #2 at Tarleton State University in Stephenville, TX. The RFQ emphasizes design for a five-level, cast-in-place parking garage with approximately 1,500 spaces and requirements for ADA compliance, sustainability, and a 50-year building lifecycle. Respondents must follow instructions on the ESBD posting (attached information sheet) to access RFQ documents and submit qualifications through the referenced procurement process.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide the selection process to enter into a contract with a construction manager at risk (CMAR) firm to provide pre-construction services such as constructability guidance, cost estimates, and construction schedules; provide a guaranteed maximum price (GMP); and perform complete construction services consistent with the cmar construction delivery process as utilized by the university system for the parking structure #2.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Provide the selection process to enter into a contract with a construction manager at risk (CMAR) firm to provide pre-construction services such as constructability guidance, cost estimates, and construction schedules; provide a guaranteed maximum price (GMP); and perform complete construction services consistent with the cmar construction delivery process as utilized by the university system for the parking structure #2.
AvailableFabricate and install security fencing in the SE corner stairwell of the parking structure.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Fabricate and install security fencing in the SE corner stairwell of the parking structure.
AvailableDESIGN-BUILD - The future design-build project is a five level, city-owned parking structure with approx. 411 parking spaces. The parking structure will be approx. 227' by 124'.
Posted Date
Dec 23, 2025
Due Date
Jan 26, 2026
Release: Dec 23, 2025
Close: Jan 26, 2026
DESIGN-BUILD - The future design-build project is a five level, city-owned parking structure with approx. 411 parking spaces. The parking structure will be approx. 227' by 124'.
AvailableParking structure rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities. The work includes miscellaneous concrete repairs, concrete beam delamination repairs, expansion joint seal system replacement, construction joint rehabilitation, water repellent application, caulk sealant removal and replacement, traffic coating removal and replacement, floor drain repair/replacement, parking stall striping, miscellaneous plumbing repairs, miscellaneous electrical repairs, metal railing section repairs and painting, architectural storefront replacement, wayfinding signage repairs, sign panel replacements, architectural precast concrete repairs, architectural facade sealant replacement, and miscellaneous architectural repairs.
Posted Date
Dec 29, 2025
Due Date
Jan 13, 2026
Release: Dec 29, 2025
Close: Jan 13, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Parking structure rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities. The work includes miscellaneous concrete repairs, concrete beam delamination repairs, expansion joint seal system replacement, construction joint rehabilitation, water repellent application, caulk sealant removal and replacement, traffic coating removal and replacement, floor drain repair/replacement, parking stall striping, miscellaneous plumbing repairs, miscellaneous electrical repairs, metal railing section repairs and painting, architectural storefront replacement, wayfinding signage repairs, sign panel replacements, architectural precast concrete repairs, architectural facade sealant replacement, and miscellaneous architectural repairs.