Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD - The future design-build project is a five level, city-owned parking structure with approx. 411 parking spaces. The parking structure will be approx. 227' by 124'.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The proposed work consists of removing old structure, excavation common, base aggregate dense, asphaltic surface, heavy riprap, structure B-62-996, beam guard, finishing items, traffic control, construction staking, and any incidental items necessary to complete the work.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
The proposed work consists of removing old structure, excavation common, base aggregate dense, asphaltic surface, heavy riprap, structure B-62-996, beam guard, finishing items, traffic control, construction staking, and any incidental items necessary to complete the work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fabricate and install security fencing in the SE corner stairwell of the parking structure.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Fabricate and install security fencing in the SE corner stairwell of the parking structure.
AvailableParking structure rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities. The work includes miscellaneous concrete repairs, concrete beam delamination repairs, expansion joint seal system replacement, construction joint rehabilitation, water repellent application, caulk sealant removal and replacement, traffic coating removal and replacement, floor drain repair/replacement, parking stall striping, miscellaneous plumbing repairs, miscellaneous electrical repairs, metal railing section repairs and painting, architectural storefront replacement, wayfinding signage repairs, sign panel replacements, architectural precast concrete repairs, architectural facade sealant replacement, and miscellaneous architectural repairs.
Posted Date
Dec 29, 2025
Due Date
Jan 13, 2026
Release: Dec 29, 2025
Close: Jan 13, 2026
Parking structure rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities. The work includes miscellaneous concrete repairs, concrete beam delamination repairs, expansion joint seal system replacement, construction joint rehabilitation, water repellent application, caulk sealant removal and replacement, traffic coating removal and replacement, floor drain repair/replacement, parking stall striping, miscellaneous plumbing repairs, miscellaneous electrical repairs, metal railing section repairs and painting, architectural storefront replacement, wayfinding signage repairs, sign panel replacements, architectural precast concrete repairs, architectural facade sealant replacement, and miscellaneous architectural repairs.
AvailableProcure prefabricated seismic join filler materials to repair damage on four floors parking structure.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Procure prefabricated seismic join filler materials to repair damage on four floors parking structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →