Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Parking structure rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities. The work includes miscellaneous concrete repairs, concrete beam delamination repairs, expansion joint seal system replacement, construction joint rehabilitation, water repellent application, caulk sealant removal and replacement, traffic coating removal and replacement, floor drain repair/replacement, parking stall striping, miscellaneous plumbing repairs, miscellaneous electrical repairs, metal railing section repairs and painting, architectural storefront replacement, wayfinding signage repairs, sign panel replacements, architectural precast concrete repairs, architectural facade sealant replacement, and miscellaneous architectural repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fabricate and install security fencing in the SE corner stairwell of the parking structure.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Fabricate and install security fencing in the SE corner stairwell of the parking structure.
Available2026 Road Rehabilitation.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
2026 Road Rehabilitation.
AvailableDESIGN-BUILD - The future design-build project is a five level, city-owned parking structure with approx. 411 parking spaces. The parking structure will be approx. 227' by 124'.
Posted Date
Dec 23, 2025
Due Date
Jan 26, 2026
Release: Dec 23, 2025
Close: Jan 26, 2026
DESIGN-BUILD - The future design-build project is a five level, city-owned parking structure with approx. 411 parking spaces. The parking structure will be approx. 227' by 124'.
AvailableThe Massachusetts Water Resources Authority is soliciting contractors to perform rehabilitation work on specified siphon and junction structures, including construction of gravel access roads, selective clearing/tree removal, waterproofing, new structure tops, access hatches and manhole frames/covers, crack repair, interior lining, and passive odor control. The solicitation includes supplying all materials, equipment, labor, and supervision required for the work. Bidding opened on 2025-12-10 and closes on 2026-01-23; bidders are directed to the MWRA supplier portal for full documents and response instructions.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
The Massachusetts Water Resources Authority is soliciting contractors to perform rehabilitation work on specified siphon and junction structures, including construction of gravel access roads, selective clearing/tree removal, waterproofing, new structure tops, access hatches and manhole frames/covers, crack repair, interior lining, and passive odor control. The solicitation includes supplying all materials, equipment, labor, and supervision required for the work. Bidding opened on 2025-12-10 and closes on 2026-01-23; bidders are directed to the MWRA supplier portal for full documents and response instructions.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis