CountyCA
Posted
Oct 30, 2026
Nov 24, 2026
Two (2) Prisoner Transport Vans and One (1) ADA Prisoner Transport Van RFP
Provide two (2) prisoner transport vans and one (1) ADA prisoner transport van.
Description: School District 68 Nanaimo-Ladysmith is soliciting quotes for two new Ford E-Transit-350 electric cargo vans. Each vehicle is specified as rear-wheel drive with a high roof and a 148-inch wheelbase, and the opportunity package includes an RFQ, sample specification sheet, response form, submission declaration, and sample supply agreement. Responses are due November 19, 2026, at 2:00 p.m.
SchoolDistrict · BC, CA
Decision makers connected to this RFP from Nanaimo-Ladysmith School District No. 68.
Adjacent opportunities open for bidding right now.
CountyCA
Posted
Oct 30, 2026
Nov 24, 2026
Provide two (2) prisoner transport vans and one (1) ADA prisoner transport van.
Raleigh Durham Airport Authority
Special DistrictNC
Posted
Nov 5, 2026
Nov 20, 2026
Qty:2 Motor Data: Frame: 445TS Voltage: 460V AC RPM: 3570 DE Bearing: 65BC03X30X26 ODE Bearing: 65BC03X30X26 UL Listed Service to Include: • Removal of motor from customers location (RDU Airport Fuel Facility 2800 John Brantley Blvd, Morrisville, NC 27560) • Replace bearings and perform PM as noted below • Re-UL Certification • Deliver motor to customers location • Reinstall and align motor PM to include: • Perform incoming tests and inspections, if applicable, as follows: • Nameplate checks against the purchase order • Measure and record insulation resistance • Measure and record axial endplay • Measure and record total indicated run out of the shaft extension • Measure and record coupling location • Measure and record air gap (if accessible) APPENDIX A (Cont.) Jet A Pump Motor Rebuild/PM Scope of Services • Perform an overall visual inspection to identify missing broken or loose components • Disassemble the motor • Clean and inspect all components • Visually inspect coils, leads, connections and other winding components for degradation (overheating, looseness, fretting, etc.) • Perform mechanical inspections of rotor as follows: • Measure and record shaft run outs on all journals and on the rotor body • Inspect all welds and bolts for signs of cracking or looseness • Perform dimensional fit inspections on all critical components (bearing journals/thrust hub to shaft fit/coupling fit) • Measure and record all critical bearing and bearing housing dimensions • Inspect and test all accessory components as applicable • Perform incoming electrical testing as follows: • Insulation resistance • Winding resistance • Surge testing • Provide an as-found report with all discrepant conditions with recommendations for replacement and repair • Dynamically balance rotor • Machine Work – If needed will be quoted additional upon inspection and evaluation • Re-assemble the motor • Install new DE bearing [ TBD ] and new ODE bearing [ TBD ] • Perform final electrical test and mechanical inspections as follows: • Measure and record insulation resistance in accordance with IEEE 43 • Measure and record winding resistance • Measure and record polarization index (PI) in accordance with IEEE 43 APPENDIX A (Cont.) Jet A Pump Motor Rebuild/PM Scope of Services • Measure and record axial endplay • Measure and record total indicated run out of the shaft extension, as accessible • Measure and record air gap (if accessible) • Perform no-load test run of the motor at full voltage monitoring: • Voltage • Bearing temperatures • Current • Casing vibration • Paint the motor in accordance with customer requirements
Lexington-Richland County School District 5
School DistrictSC
Posted
Nov 5, 2026
Nov 20, 2026
Sale of used library carts qty 2.
Lexington-Richland County School District 5
School DistrictSC
Posted
Nov 5, 2026
Nov 20, 2026
Sale of used library carts qty 2.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The LRFP report proposed acquiring electric buses and other vehicles for the NLPS fleet to lower GHG emissions.
Recommendation 17 Lower GHG emissions through the acquisition of electric buses and other vehicles for the NLPS fleet. GREEN LIGHT As of March 2026, the school district has reduced yellow fleet emissions by 39 per cent. The district operates 10 EV buses (with an additional one on order) and eight EV service vehicles. Furthermore, the infrastructure upgrade…
The Board Of Education Of School District 68 Strategic Directions Committee Meeting Minutes
Board meeting · Apr 8, 2026
Agenda packet
The preliminary local-capital schedule lists $400,000 for the Vehicle/Asset Replacement Program in 2026-27.
Information Sheet: 2025-26 Preliminary year-end accumulated operating surplus position Page 7 Revenue 2026-27 Budget 2027-28 Planning 2028-29 Planning 2029-30 Planning Deferred Revenue per Financial Statements/Future Estimates 6,951,105 5,289,319 4,489,319 929,319 Operating Fund and/or Accumulated Surplus Transfers Transfers necessary to support three-year…
The Board Of Education Of School District 68 Regular Board Meeting Agenda
Agenda packet · Sep 2, 2026
Board meeting
The district was progressing phase one and preparing phase two of a multi-phase EV fleet upgrade with south and north chargers serving buses and the white fleet.
>> Well, this is our uh this is uh phase one of uh our multi-phase uh fleet EV upgrade. And so this is the work that's going on in the yard and we have run into a few uh technical details with respect to hydro connections and hydro approvals and commissioning etc. So we've not yet plugged in our first vehicle but we expect that to happen early next week.…
Board of Education Strategic Directions Committee Strategic Directions Committee Meeting
Board meeting · Sep 16, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (1 days left)