Closing soon

(Qty 2) Jet A Pump Motor PM/Service

Description: Qty:2 Motor Data: Frame: 445TS Voltage: 460V AC RPM: 3570 DE Bearing: 65BC03X30X26 ODE Bearing: 65BC03X30X26 UL Listed Service to Include: • Removal of motor from customers location (RDU Airport Fuel Facility 2800 John Brantley Blvd, Morrisville, NC 27560) • Replace bearings and perform PM as noted below • Re-UL Certification • Deliver motor to customers location • Reinstall and align motor PM to include: • Perform incoming tests and inspections, if applicable, as follows: • Nameplate checks against the purchase order • Measure and record insulation resistance • Measure and record axial endplay • Measure and record total indicated run out of the shaft extension • Measure and record coupling location • Measure and record air gap (if accessible) APPENDIX A (Cont.) Jet A Pump Motor Rebuild/PM Scope of Services • Perform an overall visual inspection to identify missing broken or loose components • Disassemble the motor • Clean and inspect all components • Visually inspect coils, leads, connections and other winding components for degradation (overheating, looseness, fretting, etc.) • Perform mechanical inspections of rotor as follows: • Measure and record shaft run outs on all journals and on the rotor body • Inspect all welds and bolts for signs of cracking or looseness • Perform dimensional fit inspections on all critical components (bearing journals/thrust hub to shaft fit/coupling fit) • Measure and record all critical bearing and bearing housing dimensions • Inspect and test all accessory components as applicable • Perform incoming electrical testing as follows: • Insulation resistance • Winding resistance • Surge testing • Provide an as-found report with all discrepant conditions with recommendations for replacement and repair • Dynamically balance rotor • Machine Work – If needed will be quoted additional upon inspection and evaluation • Re-assemble the motor • Install new DE bearing [ TBD ] and new ODE bearing [ TBD ] • Perform final electrical test and mechanical inspections as follows: • Measure and record insulation resistance in accordance with IEEE 43 • Measure and record winding resistance • Measure and record polarization index (PI) in accordance with IEEE 43 APPENDIX A (Cont.) Jet A Pump Motor Rebuild/PM Scope of Services • Measure and record axial endplay • Measure and record total indicated run out of the shaft extension, as accessible • Measure and record air gap (if accessible) • Perform no-load test run of the motor at full voltage monitoring: • Voltage • Bearing temperatures • Current • Casing vibration • Paint the motor in accordance with customer requirements

Buyer
Raleigh Durham Airport Authority

SpecialDistrict · NC, US

Released
Nov 5, 2026
Closes
Nov 20, 2026(11 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts