Discover opportunities months before the RFP drops
Learn more →Find network infrastructure RFP opportunities from state IT departments, county technology offices, and municipal IT agencies. Browse solicitations for network equipment, cabling, switches, routers, and network services updated daily.
Northville Public Schools has issued a Request for Proposals (RFP-NVS-260000000560-1) for network switch equipment and related services. The RFP was posted on December 12, 2025, with a response deadline in mid-February 2026. Interested parties should consult the official posting on the State of Michigan's SIGMA/Advantage4 procurement portal for complete details.
Posted Date
Dec 12, 2025
Due Date
Feb 19, 2026
Release: Dec 12, 2025
Close: Feb 19, 2026
Northville Public Schools has issued a Request for Proposals (RFP-NVS-260000000560-1) for network switch equipment and related services. The RFP was posted on December 12, 2025, with a response deadline in mid-February 2026. Interested parties should consult the official posting on the State of Michigan's SIGMA/Advantage4 procurement portal for complete details.
AvailableNetwork Switches/ Network Uplink Modules/ Power Supply Modules/ Support.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Network Switches/ Network Uplink Modules/ Power Supply Modules/ Support.
AvailableBrazoria County is soliciting proposals (RFP #26-21) to replace existing Meraki access points, switches, and firewalls at most county library locations under the E‑Rate program. The solicitation was posted 2025-12-18 and is open; proposals are due January 23, 2026 at 11:00 AM CST, with the bid opening available via Zoom. Required submission is via the County’s Bonfire portal and bidders must follow E‑Rate eligibility/Service Provider requirements.
Posted Date
Dec 18, 2025
Due Date
Jan 23, 2026
Release: Dec 18, 2025
Close: Jan 23, 2026
Brazoria County is soliciting proposals (RFP #26-21) to replace existing Meraki access points, switches, and firewalls at most county library locations under the E‑Rate program. The solicitation was posted 2025-12-18 and is open; proposals are due January 23, 2026 at 11:00 AM CST, with the bid opening available via Zoom. Required submission is via the County’s Bonfire portal and bidders must follow E‑Rate eligibility/Service Provider requirements.
AvailableDieringer School District 343 is soliciting proposals for a districtwide cabling refresh to remove existing Cat 5/5e cabling and install new Cat 6/6A cabling, patch panels, wall jacks, and all associated supplies and labor at three district sites. The solicitation requests vendors to provide all labor, materials, and related work to upgrade network infrastructure to Cat 6/6A standards and references Form 470 Number: 260010820. The opportunity was posted by the district and is listed as an open RFP with proposals due on February 4, 2026.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Dieringer School District 343 is soliciting proposals for a districtwide cabling refresh to remove existing Cat 5/5e cabling and install new Cat 6/6A cabling, patch panels, wall jacks, and all associated supplies and labor at three district sites. The solicitation requests vendors to provide all labor, materials, and related work to upgrade network infrastructure to Cat 6/6A standards and references Form 470 Number: 260010820. The opportunity was posted by the district and is listed as an open RFP with proposals due on February 4, 2026.
AvailableJEA is soliciting an experienced Managed Service Provider to provide secure network infrastructure managed services, including continuous management, monitoring, and optimization of JEA’s network-security platforms. The solicitation outlines requirements such as support for Palo Alto, F5, and Aviatrix platforms, alignment with CIP and NIST controls, and 24x7 incident response coverage. Responses must be submitted electronically via JEA’s Zycus platform, with proposals due by January 21, 2026 at 12:00 PM EST.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
JEA is soliciting an experienced Managed Service Provider to provide secure network infrastructure managed services, including continuous management, monitoring, and optimization of JEA’s network-security platforms. The solicitation outlines requirements such as support for Palo Alto, F5, and Aviatrix platforms, alignment with CIP and NIST controls, and 24x7 incident response coverage. Responses must be submitted electronically via JEA’s Zycus platform, with proposals due by January 21, 2026 at 12:00 PM EST.
AvailableProject includes upgrade fiberoptic cabling to 10 GB Single Mode. Replace IDF Cabinets where cabinets will not accommodate new network switches. The composition of the fiberoptic cabling plants include tube cell air blown fiber at some schools, standard conduit fiber at others, and a combination of both types at some schools. Similarly, where standard conduit fiberoptic cabling is used, there may be existing empty conduit available for the new cabling, or existing fiberoptic cabling may need to be remove before the new cable can be installed.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Project includes upgrade fiberoptic cabling to 10 GB Single Mode. Replace IDF Cabinets where cabinets will not accommodate new network switches. The composition of the fiberoptic cabling plants include tube cell air blown fiber at some schools, standard conduit fiber at others, and a combination of both types at some schools. Similarly, where standard conduit fiberoptic cabling is used, there may be existing empty conduit available for the new cabling, or existing fiberoptic cabling may need to be remove before the new cable can be installed.
AvailableProvide services for network design, installation and maintenance for twisted pair copper cabling installation and optical fiber cabling installation.
Posted Date
Jan 3, 2023
Due Date
Feb 20, 2028
Release: Jan 3, 2023
Close: Feb 20, 2028
Provide services for network design, installation and maintenance for twisted pair copper cabling installation and optical fiber cabling installation.
AvailableSouth Coast AQMD seeks proposals for upgrading office data cabling infrastructure to the latest industry specifications, including installation of Category 6a cabling, removal of outdated cabling, and installation of network equipment. The project requires Panduit certified installers and includes a 25-year warranty. Proposals must detail methodology, work schedule, and cost breakdown.
Posted Date
Nov 7, 2025
Due Date
Jan 9, 2026
Release: Nov 7, 2025
Close: Jan 9, 2026
South Coast AQMD seeks proposals for upgrading office data cabling infrastructure to the latest industry specifications, including installation of Category 6a cabling, removal of outdated cabling, and installation of network equipment. The project requires Panduit certified installers and includes a 25-year warranty. Proposals must detail methodology, work schedule, and cost breakdown.
AvailableThe Coffee County School System is seeking proposals for a turnkey solution for network switches, access points, and transceivers, including installation and configuration.
Posted Date
Dec 8, 2025
Due Date
Jan 16, 2026
Release: Dec 8, 2025
Close: Jan 16, 2026
The Coffee County School System is seeking proposals for a turnkey solution for network switches, access points, and transceivers, including installation and configuration.
AvailableProvide computer network and cabling maintenance services, as well as audio-visual (a/v) support services, on an as-needed basis.
Posted Date
Jan 2, 2026
Due Date
Jan 16, 2026
Release: Jan 2, 2026
Close: Jan 16, 2026
Provide computer network and cabling maintenance services, as well as audio-visual (a/v) support services, on an as-needed basis.
AvailableRequest for proposals to upgrade and standardize the district's network cabling infrastructure by replacing outdated or non-compliant cables with current performance-rated cabling (e.g., Cat6/Cat6a and appropriate fiber).
Posted Date
Dec 22, 2025
Due Date
Feb 12, 2026
Release: Dec 22, 2025
Close: Feb 12, 2026
Request for proposals to upgrade and standardize the district's network cabling infrastructure by replacing outdated or non-compliant cables with current performance-rated cabling (e.g., Cat6/Cat6a and appropriate fiber).
AvailableCabling Services.
Posted Date
Dec 8, 2025
Due Date
Feb 10, 2026
Furnish and install a complete structured cabling solution meeting the current ANSI/TIA standards, including racks, network drops, demo of existing with optional pricing for a complete camera system.
Posted Date
Nov 18, 2025
Due Date
Jan 9, 2026
Release: Nov 18, 2025
Close: Jan 9, 2026
Furnish and install a complete structured cabling solution meeting the current ANSI/TIA standards, including racks, network drops, demo of existing with optional pricing for a complete camera system.
AvailableCabling Refresh Project #2
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Cabling Refresh Project #2
AvailableNetwork upgrades to include the addition of network switches and associated network gear.
Posted Date
Nov 26, 2025
Due Date
Jan 16, 2026
Release: Nov 26, 2025
Close: Jan 16, 2026
Network upgrades to include the addition of network switches and associated network gear.
AvailableProvide 50,000 Cat 6,50,000 Ft cabling or as recommended.
Posted Date
Dec 4, 2025
Due Date
Jan 19, 2026
Release: Dec 4, 2025
Close: Jan 19, 2026
Provide 50,000 Cat 6,50,000 Ft cabling or as recommended.
AvailableThis RFP is for Cabling Refresh Project #2.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
This RFP is for Cabling Refresh Project #2.
AvailableQualified contractors who will be able to furnish new ruckus switches or equivalent.
Posted Date
Nov 25, 2025
Due Date
Jan 13, 2026
Release: Nov 25, 2025
Close: Jan 13, 2026
Qualified contractors who will be able to furnish new ruckus switches or equivalent.
AvailableCabling Refresh Project.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Cabling Refresh Project.
AvailableFurnish and deliver 69kV and 15kV switches.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Furnish and deliver 69kV and 15kV switches.
AvailableGet AI-powered buying signals and real-time alerts for network infrastructure opportunities