RFP Catalog/Network Infrastructure

Network Infrastructure RFPs

Find network infrastructure RFP opportunities from state IT departments, county technology offices, and municipal IT agencies. Browse solicitations for network equipment, cabling, switches, routers, and network services updated daily.

Township of Lakewood

Mltiple EVC systems that shall be configured for public access and a pay-to-charge rate schedule. The point of interconnection for each EVC location shall be investigated and researched by the proposer at the proposer's cost.

Posted Date

Apr 27, 2026

Due Date

Jun 11, 2026

Timeline Progress77%
City of Durham

Work includes 25 SY supplementary clearing and grubbing; 4 EA select tree removal (4 to 8 inch diameter); 161 CY undercut excavation; 24 TN rip rap, class 1; 63 SY geotextile for drainage (type 2); 154 SY matting for erosion control; 2,530 SY seeding and mulching; 2,329 SY milling asphalt pavement, 1.5" depth; 302 TN asphalt concrete base course, type b25. 0b; 243 LF concrete valley gutter; 43 SY 4-inch concrete sidewalk; 10 LF masonry drainage structure; 86 LF 15-inch r. C. Pipe culverts, class iii (0 to 5-feet); 20 LF 6" water (dip); 30 LF 12" water (dip); 1 EA furnish and install fire hydrant; 60 LF 8" sanitary gravity sewer (dip).

Posted Date

May 5, 2026

Due Date

Jun 9, 2026

Timeline Progress76%
New Mexico Military Institute

New Mexico Military Institute (NMMI) is soliciting sealed proposals for Obstacle Course Infrastructure Improvements at its Roswell, NM campus, covering concrete mounting pads and footings, site demolition and asphalt removal, fencing modifications and new gate installation, concrete mow strips and curbs, and repairs to existing stone walls. The solicitation (RFP - 2026 - 08) was posted 2026-05-12 and proposals are due electronically via the NMMI Bonfire portal by 2026-06-11 at 14:00 MDT (2026-06-11T20:00:00Z); questions were due 2026-05-27. This is an open, single RFP (not a grant), and the primary RFP document is available on the buyer's portal (download requires login).

Posted Date

May 12, 2026

Due Date

Jun 11, 2026

Timeline Progress66%
250-Network Contract Office 10 (36C250)

Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), bonding, ups, building management system interfaces, asses for new and upgrades to existing hvac, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), renovation datacenter work (hvac, ups, power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new data outlets, patch panels, upgrade to cat 6a cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site.

Posted Date

May 4, 2026

Due Date

Jun 24, 2026

Timeline Progress54%
Lone Star College System

Lone Star College System (LSCS) is soliciting proposals for Cisco Smartnet licensing, maintenance, and support services to renew coverage for selected hardware across its Greater Houston campuses. The contract includes a three-year base period from December 1, 2026, to November 30, 2029, with two optional one-year renewals. The solicitation (RFP 26-05-01) requires specific bidder qualifications, including insurance and references, with an estimated value range of $250,000 to $2,500,000.

Posted Date

May 22, 2026

Due Date

Jun 16, 2026

Timeline Progress39%
Princeton Electric Plant Board (PEPB)

Seeking sealed bids for the supply of new air brake switch assemblies suitable for 13. 2 kv distribution systems for improved sectionalizing and system reliability.

Posted Date

May 6, 2026

Due Date

Jun 3, 2026

Timeline Progress92%
Space Systems Command

Complete the replacement of eight legacy power distribution switches with state of the art technology as per the SOW,

Posted Date

Apr 16, 2026

Due Date

Jun 9, 2026

Timeline Progress85%
Yonkers Public Schools

The City of Yonkers is soliciting bids to purchase up to 1,000 Cisco Duo or approved-equal hardware tokens, with an initial order of 300 units and subsequent orders having a minimum of 100 units. The contract term is 12 months, delivery is to the City of Yonkers Department of Information Technology, and award will be to the lowest responsive and responsible bidder.

Posted Date

Sep 16, 2025

Due Date

Oct 2, 2026

Timeline Progress68%
Oswego County

Oswego County is soliciting qualified contractors to perform approximately 15.4 miles of aerial and underground fiber optic cabling across the Oswego County service area. Work will be issued on a task-order basis as permits and pole licenses are secured, with the potential for multiple contractors to be awarded different segments. Bids for this project, identified as Contract Number BID 26-OSI-011, must be submitted to the Oswego County Purchasing contact by the June 2026 deadline.

Posted Date

May 5, 2026

Due Date

Jun 5, 2026

Timeline Progress86%
County of San Diego

Provide as-needed electrical and low-voltage cabling services and structure cabling system design services to repair, replace, modify and maintain existing networks for data, telephone, video-conferencing and audio video cabling, including overhead speakers for paging and radio traffic. Work to be performed includes new installations, system maintenance and emergency system restoration, to include related materials.

Posted Date

Apr 27, 2026

Due Date

Jun 11, 2026

Timeline Progress77%
Oswego County

Work consist of constructing approx 27.4 miles of fiber optic cable.

Posted Date

May 14, 2026

Due Date

Jun 12, 2026

Timeline Progress61%
City of Southfield

Infrastructure Improvement Projects.

Posted Date

Jan 30, 2024

Due Date

Jan 1, 2028

Timeline Progress60%
Cook County

Work includes 10 LF televised inspection of sewers and sewer structures; 2 cy additional trench excavation (within trench neat lines) 8 to 12' from ground level; 5 LF streetcar track and tie removal with jumper cable; 5 LF streetcar track and tie removal -without jumper cable; 10 CY rock excavation; 50 LF water main installed in open cut - 8"; 50 LF water main installed in open cut - 12"; 50 LF water main installed in open cut - 16"; 50 LF water main installed in open cut - 24"; 50 LF water main (restrained joint) installed in open cut - 12"; 50 LF water main (restrained joint) installed in open cut - 16:". See attached file.

Posted Date

Apr 29, 2026

Due Date

Jun 10, 2026

Timeline Progress78%
Pennsylvania Department of Education

The Pennsylvania Department of Education (PDE) issued this RFP to procure architectural and engineering services to perform K–12 public school facility condition assessments under the federal Supporting America’s School Infrastructure (SASI) grant. Contractors will perform on-site evaluations, analyze major building systems, identify deficiencies, and produce cost estimates and standardized reports for 128 facilities. The solicitation is open with a due date of July 17, 2026, and requires completion of Phase 1 assessments by November 15, 2027.

Posted Date

May 18, 2026

Due Date

Jul 17, 2026

Timeline Progress23%
Village of Pinehurst

Rattlesnake Trail Infrastructure Improvements project, which includes the installation of approximately 1,200 LF of new 5' wide brick sidewalk, plus approximately 200 LF of 5' X 2' concrete box culvert and approximately 600 LF of 24-inch RCP storm drain pipe with related appurtenances.

Posted Date

May 10, 2026

Due Date

Jun 2, 2026

Timeline Progress94%
County of Dane

Acquisition, construction or rehabilitation of public facilities projects.

Posted Date

May 12, 2026

Due Date

Jun 23, 2026

Timeline Progress47%
Clark County School District

Student virtual desktop infrastructure.

Posted Date

May 14, 2026

Due Date

Jun 4, 2026

Timeline Progress84%
City of Boston

Provide professional services across five (5) discrete IT security and infrastructure improvement projects. The vendor shall provide: Conduct a comprehensive assessment of the current patch and software update procedures, identifying gaps, inefficiencies, and risks. Repair issues with SCCM and Patch My PC deployments to all devices and servers to cover all existing needed patches. Design and document a standardized, repeatable patch management lifecycle, including scheduling, testing, deployment, verification, and rollback procedures. The anticipated contract period is June 18, 2026 through November 30, 2026. See attached file.

Posted Date

May 11, 2026

Due Date

Jun 8, 2026

Timeline Progress74%
City of Fall River

Work include removal and replacement of 2,000 LF existing 12 water main and appurtenances including gate valves, valve boxes, hydrants, services and temporary bypass piping; and for all trench pavements. The work also includes milling and overlay, sidewalk and curbing replacement, pedestrian safety improvements, and ada-compliant ramp replacement. Bid alternate a consists of furnishing all labor, tools, materials and equipment necessary to cipp line 1,200 lf20" cicl water main. Bid alternate b consists of furnishing all labor, tools, materials and equipment necessary for the removal and replacement of 1,200 LF 20" cicl water main.

Posted Date

May 27, 2026

Due Date

Jun 11, 2026

Timeline Progress31%
Rowan Cabarrus Community College

Work shall consist of extension of existing campus infrastructure including private water and sewer distribution system extensions and a private road extension.

Posted Date

Apr 13, 2026

Due Date

Jun 1, 2026

Timeline Progress99%

Win More Network Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for network infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available