RFP Catalog/Defense Hardware & Components

Defense Hardware & Components RFPs

Search defense hardware and components RFP opportunities from Department of Defense agencies, military contractors, and defense suppliers. Find solicitations for defense components, military hardware, NSN parts, and defense equipment updated daily.

Santa Monica-Malibu Unified School District

Provide districtwide preventative maintenance services for high-voltage electrical switchgear at various district facilities. The work shall include the development and implementation of a complete electrical switchgear preventative maintenance and management program, including visual and mechanical inspection; cleaning, lubricating, tightening, and alignment of draw-out circuit breakers and associated components; electrical testing, including insulation resistance testing and circuit breaker contact resistance testing.

Posted Date

Apr 27, 2026

Due Date

Jun 11, 2026

Timeline Progress77%
Air Force Sustainment Center

This Combined Synopsis/Solicitation from the Department of the Air Force seeks contractors to replace the 3000A 208V switchgear in Building 1 at Tinker AFB. The project is restricted to Small Business MAC BOA holders and requires attendance at a mandatory initial site visit scheduled for May 14, 2026. Proposals are due by June 16, 2026, and interested parties must follow DoD Safe procedures to receive project-specific documents.

Posted Date

May 1, 2026

Due Date

Jun 16, 2026

Timeline Progress67%
City of Fresno

The City of Fresno is soliciting proposals for testing and maintenance services of medium- and low-voltage switchgear and motor control centers to ensure reliability and safety following NETA and NFPA 70B standards. The contract term is three years with two one-year extension options and covers testing of breakers, relays, switchers, and associated cables at various City locations. Proposals must be submitted electronically by June 16, 2026, following a remote pre-bid conference scheduled for early June.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
Moorhead Public Service

A new lineup of 15 kV indoor metalclad switchgear for Northeast Substation including seventeen vacuum circuit breakers with related controls and accessories. A new lineup of 15 kV indoor metalclad switchgear for Southeast Substation including eleven vacuum circuit breakers with related controls and accessories.

Posted Date

Apr 22, 2026

Due Date

Jun 2, 2026

Timeline Progress97%
DLA Troop Support

The Department of the Navy (NAVSUP Weapon Systems Support) issued a presolicitation for repair services for NIIN 011742184 (part number 153D8494G1), quantity 21. The opportunity is classified under NAICS 335312 and PSC 6110 with place of performance in Vandalia, OH, and no attachments or solicitation document were posted on SAM.gov. The original response (bid) deadline is June 3, 2026 and the notice is a presolicitation (not a grant).

Posted Date

May 13, 2026

Due Date

Jun 3, 2026

Timeline Progress89%
Lancaster Area Sewer Authority

demolition; bypass pumping; electrical service and distribution and switchgear replacement and associated earthwork, utilities, and cast-in-place concrete; electro-magnetic flowmeter and associated pipe, fittings, and painting; and all other work. The work includes all requirements to provide a fully finished and operable switchgear and electro-magnetic flowmeter for a fully functional pump station as indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. The work also includes all specified, indicated and shown electrical equipment, appliances, appurtenances, furnishings, electro-magnetic flowmeter, instrumentation and controls, accessories, tests and sundry parts and material as shall be necessary and required for a completely operable installation satisfactory to the Engineer.

Posted Date

Apr 28, 2026

Due Date

Jun 4, 2026

Timeline Progress91%
Kern High School District

The Kern High School District is soliciting bids for electrical safe-off, salvage, and switchgear procurement for the Vista Continuation High School Modernization project. The scope includes providing safe-off of electrical systems for demolition, selective salvaging of components, and procuring the main switchgear. Bids must be submitted in paper format by June 10, 2026, following a mandatory pre-bid meeting.

Posted Date

May 21, 2026

Due Date

Jun 10, 2026

Timeline Progress54%
Michigan Department of Technology, Management and Budget

The Michigan Department of Technology, Management and Budget has issued a Request for Quotes for the replacement and installation of a generator, automatic transfer switch, and switchgear at the Oaks Correctional Facility. This Phase II project is a construction and electrical contract with an estimated value between $250,000 and $900,000. Interested bidders must access the official SIGMA procurement system to view full solicitation documents and submission instructions.

Posted Date

May 26, 2026

Due Date

Jun 24, 2026

Timeline Progress20%
DCMA Raytheon Tucson

The Defense Logistics Agency Aviation is soliciting proposals for C-5 Galaxy aircraft spare parts, specifically right-hand and left-hand center drive units (mechanical actuators). This is an unrestricted, indefinite-delivery fixed-price procurement currently sole-sourced to Honeywell International, requiring contractors to submit technical and price proposals. The contract covers a three-year ordering period with delivery to DLA Distribution Warner Robins at Robins Air Force Base, Georgia.

Posted Date

Apr 22, 2026

Due Date

Jul 19, 2026

Timeline Progress45%
Air Force Materiel Command

The acquisition of the spares of NSN’s listed below in support of the C­5 Galaxy: Center Drive Unit/Mechanical Actuator (Right Hand): NSN 1680­01­631­3650UC (Part Number 126888­14); ­Center Drive Unit/Mechanical Actuator (Left Hand): NSN 1680­01­631­3646UC (Part Number 126888­13).

Posted Date

Apr 22, 2026

Due Date

Jul 19, 2026

Timeline Progress45%
DLA Aviation

The procurement of non-commercial engineering services necessary to support the F-22 Actuators program.

Posted Date

May 15, 2026

Due Date

Jun 1, 2026

Timeline Progress98%
242-Network Contract Office 02 (36C242)

The Department of Veterans Affairs is seeking contractors to replace the boiler plant main electrical switchgear at the St. Albans Community Living Center in New York. This project is set aside for Service-Disabled Veteran-Owned Small Businesses and has an estimated construction magnitude between $2,000,000 and $5,000,000. Interested bidders must provide a 20% bid bond and follow specifications that will be released in the full solicitation package.

Posted Date

Mar 6, 2026

Due Date

Jun 4, 2026

Timeline Progress96%
Naval Supply Systems Command (NAVSUP)

Repair of NIIN 013070911 / Part Number 843-67-2A-M-1

Posted Date

May 13, 2026

Due Date

Jun 3, 2026

Timeline Progress89%
Naval Supply Systems Command (NAVSUP)

Fms repair of 1 ea valve, butterfly, NSN 7R 4810 001067401, Part Number: 392200-11-1, fuel control assy NSN 7R 3040 014869350 (Part Number: 3617750-5, QTY 3 to QTY 4 Ea.

Posted Date

Feb 26, 2026

Due Date

Jun 1, 2026

Timeline Progress100%
Washington Headquarters Services (WHS)

Connector, leakage fitting; NSN: 4730-01-336-0491; Part number: 16206987; EA 1. Gasket, valve body cover; NSN: 5330-01-277-7253; Part number: 10555059; EA 1. Filter element, fuel oil; NSN: 4330-01-270-2542; Part number: 16107824; EA 1. O ring, adapter seal, silicone, ; NSN: 5330-01-J19-1491; Part number: 16706675; EA 1. Seal, compartment, ; NSN: 5330-00-905-0176; Part number: 16702201; EA 1. Gasket, lube oil suction for colt fairbanks ; NSN: 5330-00-379-1505; Part number: 16100447; EA 1. Gasket, plug, copper, ; NSN: 5330-00-460-4535; Part number: 16700814; EA 1. Gasket, nozzle holder, ; NSN: 5330-00-816-4806; Part number: 16701772; EA 1. Gasket, blind cover; NSN: 5330-00-333-2073; Part number: 16703754; EA 1. Adapter nozzle,; NSN: 2910-00-816-4805; Part number: 16204186; EA 1. Adapter, check valve to cylinder liner. ; NSN: 2815-00-324-7551; Part number: 16108791; EA 1. Pipe, water header to liner; NSN: 4710-00-036-4801; Part number: 16200285; EA 1. Seal, water pump shaft; NSN: 2815-01-J19-3028; Part number: 16703347; EA 1. O-ring, ; NSN: 5330-01-024-8501; Part number: 1061007; EA 1. See attached file.

Posted Date

May 6, 2026

Due Date

Jun 8, 2026

Timeline Progress78%
DLA Troop Support

This solicitation (SPRPA126QVB83) issued by the Department of Defense via DLA Aviation - Philadelphia seeks electro-mechanical actuators under NAICS code 336413. It is a firm-fixed-price supply procurement issued under Emergency Acquisition Flexibilities with offers due by June 12, 2026. The procurement is for specific line-item components identified by National Stock Number (NSN) for military aviation support.

Posted Date

May 13, 2026

Due Date

Jun 12, 2026

Timeline Progress62%
W6QK Army Contracting Command (ACC) Ri

Provide fire extinguisher cartridges TY61, across three interchangeable part numbers as follows: NSN: 1377-00-174-5024 Part Number: 895409, 895409-1. NSN: 1377-01-660-5592 Part Number: CT02400-1. NSN: 1377-01-563-3603 Part Number: 200810. See attached file.

Posted Date

May 27, 2026

Due Date

Jun 16, 2026

Timeline Progress24%
DLA Maritime

The Defense Logistics Agency is soliciting quotes for the procurement of 102 mounting brackets (NSN 5340-01-537-4326). The approved source for this requirement is Oshkosh Defense under part number 3286529. This is a federal Request for Quote (RFQ) with delivery expected within 116 days after the order is placed.

Posted Date

May 20, 2026

Due Date

Jun 4, 2026

Timeline Progress78%
Air Force Sustainment Center

F16__AIBU NSN: 5895013310720_PN: 5188110_008.

Posted Date

Jul 3, 2024

Due Date

Jul 3, 2026

Timeline Progress96%
U.S. Army Contracting Agency

The Defense Logistics Agency (DLA) Aviation at Huntsville issued Combined Synopsis/Solicitation SPRRA2-26-R-0046 to add seven Patriot Missile spare NSNs to an existing contract. This action is a sole-source procurement to Raytheon Company under a 3-year Indefinite Delivery Requirements contract with pricing requested for a five-year period. Proposals are due by July 2, 2026, for deliveries designated for Redstone Arsenal and Fort Bliss.

Posted Date

Apr 3, 2026

Due Date

Jul 2, 2026

Timeline Progress65%

Win More Defense Hardware & Components RFPs

Get AI-powered buying signals and real-time alerts for defense hardware & components opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available