RFP Catalog/Defense Hardware & Components

Defense Hardware & Components RFPs

Search defense hardware and components RFP opportunities from Department of Defense agencies, military contractors, and defense suppliers. Find solicitations for defense components, military hardware, NSN parts, and defense equipment updated daily.

W6QK Army Contracting Command (ACC) Aberdeen Proving Ground

NSN 1560016252675 Cell, Fuel, in support of KC-135 Aircraft.

Posted Date

May 27, 2026

Due Date

Jun 26, 2026

Timeline Progress16%
DLA Aviation

102 ea Gearbox assembly, AI, NSN: 1680-014506898, P/N: 183315-1, weapon system designator code 26F.

Posted Date

Apr 8, 2026

Due Date

Jun 8, 2026

Timeline Progress88%
City of Los Angeles

Siemens industry, inc. Gmsg-36811 4. 16kv, 60kv bil, 1200a, 40ka interrupting capability, 3ph, 3w, nema 3r, non-arc resistant, outdoor non-walk-in (type omg-sg) medium voltage switchgear 250vdc control power, 3 vertical sections, 4 breakers, 2 each.

Posted Date

May 13, 2026

Due Date

Jun 11, 2026

Timeline Progress64%
City of Phoenix

Supply of electric actuators, parts, valves, gearboxes, accessories, and related software.

Posted Date

May 14, 2026

Due Date

Jun 4, 2026

Timeline Progress84%
City of Dallas

Electric Switchgear Repair Services.

Posted Date

Apr 2, 2026

Due Date

May 29, 2026

City of Naperville

Work consist of construct one (1) 34. 5kv switchgear building weather-tight, with all associated foundation, doors, roofing, lighting, receptacles, hvac, drainage piping, building grounding, etc.

Posted Date

Apr 27, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
City of Hastings

2000A EO Circuit Breaker, 50kA (loose);1200A EO Circuit Breaker, 50kA (loose).

Posted Date

Feb 19, 2026

Due Date

Jun 3, 2026

Timeline Progress98%
Kandiyohi County

​​Removal and replacement of existing utility transformer and building switchgear.​​

Posted Date

May 16, 2026

Due Date

Jun 2, 2026

Timeline Progress92%
New York State Department of Corrections and Community Supervision

The New York State Department of Corrections and Community Supervision is soliciting work to test and provide generators and switchgear at Orleans Correctional Facility to ensure power continuity for critical buildings. The scope includes testing relays, pad-mounted switches, transformers, providing and installing multiple generators of specified kW capacities, staging/fueling/monitoring, and installing UL-listed infra-red windows in switchgear; work must follow prevailing wage rules. Bidders must meet Service-Disabled Veteran-Owned Business (SDVOB) and MBE/WBE participation goals and coordinate with facility management for scheduling.

Posted Date

May 14, 2026

Due Date

Jul 16, 2026

Timeline Progress28%
Orleans Correctional Facility

Provide equipment testing services for generator relays; (14) pad mounted switches; (15) transformers. Facility will require the following generators for critical buildings; (2) 400kw-bldgs. 1 and 34; 300kw-bldg. 2; (2) 150kw-bldgs. 10and 11; contractor to provide generators and contact critical buildings to maintain power during service, service and testing of medium voltage switchgear & transfer switches general service and testing include cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable; service and testing of automatic transfer switches; Install UL listed Infra-Red windows in the incoming switchgear cabinets.

Posted Date

May 14, 2026

Due Date

Jul 16, 2026

Timeline Progress28%
Sacramento Municipal Utility District

Sacramento Municipal Utility District (SMUD) is soliciting bids to establish a three-year strategic alliance with one or more suppliers for pad-mount distribution switchgear to ensure a reliable, continuous supply. The solicitation requires vendors to have a national presence, a full range of distribution switchgear products, ISO certification, and support capabilities. Bids are to be submitted electronically and the solicitation is a bidding type with an estimated value around $6,000,000.

Posted Date

May 13, 2026

Due Date

Jun 1, 2026

Timeline Progress98%
Lafayette Consolidated Government

4 way switchgear cab stock.

Posted Date

May 22, 2026

Due Date

Jun 5, 2026

Timeline Progress69%
Wilmington WWTP

work inlcudes installation, inspection and testing of the subject equipment, provide connection to the utility and reconnection of the existing electrical loads, demolish the existing equipment after proof of operation of the new electrical system.

Posted Date

May 22, 2026

Due Date

Jun 30, 2026

Timeline Progress25%
Fairfax County

This solicitation seeks to establish term contracts for switchgear testing and preventative maintenance services. The work supports the Department of Public Works and Environmental Services Wastewater Treatment and Collections Divisions. The selected contractor must provide all necessary labor, materials, and equipment to fulfill the technical requirements.

Posted Date

May 12, 2026

Due Date

Jun 9, 2026

Timeline Progress70%
Department of State

The U.S. Embassy in Kathmandu issued a solicitation for preventive maintenance services of low voltage switchgear, requiring comprehensive inspections, testing, and reporting to meet Department of State standards. The contract includes a one-year base period with options for four additional years, with performance located in Kathmandu, Nepal. The estimated value of the contract ranges from $15,000 to $60,000.

Posted Date

May 4, 2026

Due Date

Jun 3, 2026

Timeline Progress92%
New York State Office of General Services

The New York State Office of General Services (OGS) is soliciting bids to upgrade electrical distribution systems, the facility generator, and switchgear at a state facility. The solicitation is an Invitation for Bid (NAICS 237110) with an estimated budget range of $500,000–$5,000,000 and a project duration of approximately 1,091 days. The opportunity opened on 2026-04-21 and closes on 2026-06-03, with a pre-bid/site visit scheduled for 2026-05-22.

Posted Date

Apr 21, 2026

Due Date

Jun 3, 2026

Timeline Progress95%
City of Columbia

The City of Columbia (Utilities Department) requests proposals to relocate two 161/13.8 kV transformers and two switchgears from the Municipal Power Plant to the Bolstad Substation, including pre-relocation testing, disassembly, rigging and heavy hauling, reassembly, vacuum filling if required, and post-relocation testing. The period of performance is planned between September 1, 2026 and October 31, 2026. Proposals are due June 23, 2026 and the solicitation is open (not a grant).

Posted Date

May 26, 2026

Due Date

Jun 23, 2026

Timeline Progress20%
New York City

Upgrade electrical distribution, facility generator & switchgear also includes hvac work.

Posted Date

Apr 16, 2026

Due Date

Jun 3, 2026

Timeline Progress95%
Northern Wasco County Peoples Utilities District

Purchase and delivery of two (2) 15 kv class prefabricated metal-clad switchgear & control house.

Posted Date

Apr 13, 2026

Due Date

Jun 2, 2026

Timeline Progress97%
Santa Monica-Malibu Unified School District

Provide districtwide preventative maintenance services for high-voltage electrical switchgear at various district facilities. The work shall include the development and implementation of a complete electrical switchgear preventative maintenance and management program, including visual and mechanical inspection; cleaning, lubricating, tightening, and alignment of draw-out circuit breakers and associated components; electrical testing, including insulation resistance testing and circuit breaker contact resistance testing.

Posted Date

Apr 27, 2026

Due Date

Jun 11, 2026

Timeline Progress77%

Win More Defense Hardware & Components RFPs

Get AI-powered buying signals and real-time alerts for defense hardware & components opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available