RFP Catalog/API Management Solution

API Management Solution RFPs

Browse active API Management Solution RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

Washington State University

Remove both of the existing gateway signs at the entrance to the Tri-Cities campus and in front of the Wine Science Center. Construct new concrete and basalt signs at each location. There is electric at both locations that power the lights for the signs, and that will need to be removed and reinstalled. Restore landscaping around the signs to match existing. Alternate No. 1: Replace a third gateway sign on the corner of University Drive and Crimson Way.

Posted Date

May 27, 2026

Due Date

Jun 18, 2026

Timeline Progress17%
Central Texas Regional Mobility Authority

The Central Texas Regional Mobility Authority is seeking qualifications from Tolling System Integrators for toll systems integration, maintenance, and image review services. This procurement aims to identify qualified firms capable of managing the technical and operational aspects of the authority's tolling infrastructure. Responses are intended to support the ongoing efficiency and accuracy of the region's electronic toll collection systems.

Posted Date

Apr 30, 2026

Due Date

Jun 12, 2026

Timeline Progress71%
Naval Undersea Warfare Center (NUWC)

Provide H dept weapons control and integration prototyping and fabrication.

Posted Date

May 7, 2026

Due Date

Jun 5, 2026

Timeline Progress82%
W6QK Army Contracting Command (ACC) Ri

This SAM.gov posting is a Broad Agency Announcement (BAA) from the Army Artificial Intelligence Integration Center (AI2C) seeking artificial intelligence research and development whitepapers and proposals across multiple AI/ML, autonomous platforms, and synthetic environment topics. The announcement may lead to multiple types of award instruments (FAR-based contracts or assistance agreements) and lists Pittsburgh, PA as the primary place of performance. The latest response deadline is July 16, 2026.

Posted Date

Jul 31, 2025

Due Date

Jul 16, 2026

Timeline Progress87%
U.S. Special Operations Command (USSOCOM)

This notice is a Justification for Exception to Fair Opportunity (JEFO) to authorize a one-month bridge extension for Communication Integration Support (CCCI) services supporting U.S. Central Command. The bridge covers the period from May 1, 2026, through May 31, 2026, to ensure the continuity of critical public affairs and strategic communications operations. The requirement includes roles such as media analysts and social media specialists to maintain USCENTCOM's mission-essential communication functions.

Posted Date

May 1, 2026

Due Date

May 31, 2026

Timeline Progress99%
Unified Government of Athens-Clarke County

Athens-Clarke County Government is soliciting a contractor to upgrade and integrate SCADA systems and install PLCs and HMIs at its water treatment plant, remote storage sites, and three water reclamation facilities. The project includes the installation, configuration, and testing of new SCADA servers and workstations while maintaining existing operations. Proposals are being accepted through the county's OpenGov portal with a final submission deadline in June 2026.

Posted Date

May 11, 2026

Due Date

Jun 9, 2026

Timeline Progress68%
Southern Minnesota Education Consortium

Southern Minnesota Regional Legal Services (SMRLS) is seeking a qualified technology partner to design and build an internal Legal Organizations Online Network (LOON). The project aims to enhance the statewide LOON database with AI-powered tools to improve referral accuracy and streamline intake workflows. This RFP covers Phases 1 and 2 of the project, with a possible extension for a third phase.

Posted Date

May 15, 2026

Due Date

Jun 18, 2026

Timeline Progress46%
Air Force Materiel Command

Landing gear spare parts in support of multiple weapon systems.

Posted Date

Nov 12, 2025

Due Date

Jun 4, 2026

Timeline Progress98%
City of Pasadena

Work consist of replacement of the existing ten (10) meters, addition of two (2) meters for supporting, replacement of the three (3) existing meters, 13 new meters shall be installed in existing meter sockets and existing meter cabinets and the two bess meters will require new sockets.

Posted Date

May 6, 2026

Due Date

Jun 8, 2026

Timeline Progress75%
Pasadena Water and Power

Pasadena Water & Power (PWP) is soliciting sealed bids to replace the Remote Intelligent Gateway (RIG) and existing CAISO revenue meters at the Glenarm Dispatching Station and the TM Goodrich Receiving Station. The contractor will install, inspect, test, commission, and certify a total of 15 meters (13 in existing sockets and 2 new sockets for BESS), and will load PWP-provided meter programs and provide Meter and Site Verification (MSVS) forms; PWP will furnish meters and coordinate CAISO meter outage and new-resource activities. Bids are due June 8, 2026 (11:00 AM Pacific Time) and the solicitation was posted May 6, 2026.

Posted Date

May 7, 2026

Due Date

Jun 8, 2026

Timeline Progress74%
City of Fort Walton Beach

This is a Request for Qualifications (RFQ) for gateway entrance improvements at The Landing Park in Fort Walton Beach, Florida. The solicitation seeks qualified firms for construction and related services for the gateway entrance improvements as part of the park's renovation project. Procurement documents and specific response instructions are available through the buyer's official posting on BidNet Direct, which requires vendor registration for full access.

Posted Date

-

Due Date

Jun 4, 2026

Network Contract Office 23 (36C263)

This is a Request for Information (Sources Sought) issued by the Department of Veterans Affairs (VISN 23) to gather market capability information for surgical lights, equipment booms, video integration systems, and maintenance services. Responses are due June 6, 2026, and must include vendor capability statements, Unique Entity Identifier, and proposed edits to the draft Statement of Work. This announcement is for market research purposes only and no contract awards will be made directly from this posting.

Posted Date

May 14, 2026

Due Date

Jun 6, 2026

Timeline Progress73%
656-St Cloud VA Medical Center (00656)

Provide lights, booms and video integration equipment and support services. Provide surgical lights, booms, video integration software, equipment, accessories and maintenance/repair services to Veterans Integrated Service Network 23 (VISN 23) hospitals and clinics.

Posted Date

May 14, 2026

Due Date

Jun 6, 2026

Timeline Progress73%
Alaska Aerospace Corporation

2 pre-engineered metal building - vehicle integration building.

Posted Date

May 15, 2026

Due Date

Jun 9, 2026

Timeline Progress63%
Alaska Department of Military and Veterans Affairs

The Alaska Aerospace Corporation (AAC) is seeking contractors to design, supply, transport and install two Vehicle Integration Buildings (pre-engineered metal buildings) at the Pacific Spaceport Complex – Alaska (Kodiak). The work includes design and installation of two identical pre-engineered metal buildings engineered for severe Kodiak Island conditions (high wind, snow, seismic design, and corrosion mitigation), and compliance with applicable codes and PE-reviewed structural calculations. The solicitation includes design drawings and an ITB/solicitation document listed in the notice attachments and is a procurement (not a grant).

Posted Date

May 15, 2026

Due Date

Jun 11, 2026

Timeline Progress58%
City of Orlando

Design/Build: Furnish the design services and construction services for downtown accent lighting system integration project.

Posted Date

May 3, 2026

Due Date

Jul 2, 2026

Timeline Progress46%
City of Kissimmee

The City of Kissimmee is soliciting proposals for the rehabilitation, marking, and lighting of Taxiway Alpha at Kissimmee Gateway Airport. The project includes shifting the taxiway to correct the runway-to-taxiway offset from 350 feet to 400 feet to comply with current FAA standards. This construction effort is part of a larger airport improvement initiative supported by federal grant funding.

Posted Date

May 3, 2026

Due Date

Jun 2, 2026

Timeline Progress92%
Kissimmee Gateway Airport

Rehabilitate, Mark, and Light Taxiway Alpha and correct Runway to Taxiway offset from 350 to 400 to meet FAA standards. This project extends from Runway 15 North, south to the end of Runway 33, the full length of Taxiway of TW Alpha. Geometry problems at crossing taxiways will be corrected for fillets and the required 90 degree centerline entrance to Runway 15-33. Due to existing problems with direct buried cabling, and the shift of the taxiway 50 east, the existing lighting and signs will be replaced with new cable in conduit and LED fixtures. The taxiway has a low PCI value of 54 overall. In addition, the taxiway geometry and centerline offset separation from the primary runway does not conform to the latest FAA AC guidance requirements and standards for geometry and offset. Work includes existing pavement demolition, milling, reclaiming\rotomixing, new pavement structures including new P-401 asphalt surface and leveling courses, new base and subbase, stabilized shoulders, new P501 concrete compass calibration pad, storm drainage pipe culverts and inlet\control structures, grading, airfield marking, fencing, turfing, lighting, signage, vault work, and ALCS modifications.

Posted Date

May 3, 2026

Due Date

Jun 2, 2026

Timeline Progress92%
Oak Ridge National Laboratory (UT-Battelle) (Contractor)

To collaborate with industry to investigate, improve, develop, and deploy innovative energy efficient building technologies.

Posted Date

Dec 13, 2023

Due Date

Dec 13, 2028

Timeline Progress49%
Oak Ridge National Laboratory (UT-Battelle) (Contractor)

Provide industry partners to participate in short-term, collaborative projects within the grid research integration and deployment center (grid-c) to accelerate development and deployment of grid integrated power electronics technologies. The objective of these GRID-C Technical Collaborations is to collaborate with industry to investigate, improve, develop, and deploy innovative integrated and resilient grid resources for further intelligent electrification at the grid interfaces.

Posted Date

Aug 2, 2024

Due Date

Aug 2, 2029

Timeline Progress37%

Win More API Management Solution RFPs

Get AI-powered buying signals and real-time alerts for api management solution opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available