Moss Avenue Pump Station Rehabilitation Project RFP
Aug 24, 2026
Closes
Sep 17, 2026
Work includes 100 SF of repair type a1 horizontal shallow concrete spall repair, 75 SF of repair type a2 vertical/overhead shallow concrete spall repair, 300 SF of repair type d urethane crack injection, 200 LF repair type e crack rout and seal, scada equipment installation, general electrical work. See attached file.
