Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Wilmington
Dry Weather Pump Station project consists of obtaining all required permits; demolition of the existing traffic division maintenance building and associated electrical and site infrastructure; and construction of a new Power and Control Building and Dry Weather Pump Station (DWPS). Work includes installation of reinforced concrete foundations and pads, medium-voltage electrical equipment and transformers (owner-furnished), duct banks and wiring, large- diameter piping connections, valves, flow metering vaults, stormwater improvements, rock excavation, grading, paving, and site restoration. The project also includes phased electrical changeovers to maintain continuous operations, integration with existing pump station facilities, SCADA and controls programming, security components, coordination with utility providers and other ongoing contracts, and all associated mechanical, HVAC, and electrical work necessary for a complete and operational system
Posted Date
Mar 2, 2026
Due Date
Apr 21, 2026
Release: Mar 2, 2026
City of Wilmington
Close: Apr 21, 2026
Dry Weather Pump Station project consists of obtaining all required permits; demolition of the existing traffic division maintenance building and associated electrical and site infrastructure; and construction of a new Power and Control Building and Dry Weather Pump Station (DWPS). Work includes installation of reinforced concrete foundations and pads, medium-voltage electrical equipment and transformers (owner-furnished), duct banks and wiring, large- diameter piping connections, valves, flow metering vaults, stormwater improvements, rock excavation, grading, paving, and site restoration. The project also includes phased electrical changeovers to maintain continuous operations, integration with existing pump station facilities, SCADA and controls programming, security components, coordination with utility providers and other ongoing contracts, and all associated mechanical, HVAC, and electrical work necessary for a complete and operational system
AvailableCity of Wilmington
The City of Wilmington is seeking bids for concrete improvements.
Posted Date
Mar 18, 2026
Due Date
Apr 17, 2026
Release: Mar 18, 2026
City of Wilmington
Close: Apr 17, 2026
The City of Wilmington is seeking bids for concrete improvements.
AvailableCity of Wilmington
Seeking for powder activated carbon.
Posted Date
Feb 25, 2026
Due Date
Apr 16, 2026
Release: Feb 25, 2026
City of Wilmington
Close: Apr 16, 2026
Seeking for powder activated carbon.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Wilmington, City of - Dept of Finance
The document provides logistical details for a virtual meeting of the Pension Commission, including the date, time, and connection information for access via Microsoft Teams and dial-in phone numbers. No specific discussion topics or agenda items beyond the designation of the meeting itself are present.
This document presents a preliminary financial plan for the Water and Sewer Enterprise Fund of Wilmington Utilities, spanning Fiscal Years 2027 to 2032. The plan aims to achieve long-term financial resilience and reliable services by establishing best practices. Key areas include strategies for financial recovery, stability, and sustainability, detailed projections for revenues, operations and maintenance costs, and a significant six-year Capital Improvement Program totaling $412.2 million. It also addresses various financial scenarios and customer affordability initiatives.
The key topics scheduled for discussion during the meeting include the Call to Order, the Approval of Minutes from the Previous Pension Board Meeting, a presentation from Marquette, and updates regarding the Cheiron OPEB Plan, concluding with Adjournment. The meeting is designated as a public meeting and will be held at an anchor location in the City County Building or via Zoom.
The primary focus of the meeting was a presentation by Black & Veatch regarding Preliminary Revenue Projections for the water and sewer enterprise fund covering FY 2026 through FY 2032 under existing rates. The presentation detailed the six-year financial planning process, assumptions for retail and wholesale revenue projections, and consumption trends which showed a system-wide decline in FY 2024 and FY 2025 compared to FY 2023. Following this, Public Works presented the six-year (FY 2027-FY 2032) water and wastewater Capital Improvement Program (CIP), which emphasizes water projects due to regulations like LCRR and PFAS. The total six-year CIP is projected to be $412.2 million, covering treatment plant upgrades, distribution improvements including lead service line replacements, and wastewater treatment plant upgrades. The session concluded with an executive session.
The Board's New Business agenda included several zoning appeal requests requiring variances. These applications covered requests to reestablish a restaurant/grocery at 800 North Church Street, permission to operate a child day care center at 2618 North Van Buren Street, permission to reactivate a nonconforming restaurant use at 308 East 11th Street, and permission to convert a building at 738 East 11th Street into a coffee shop and six apartments, which also involved requesting a variance for the rear yard requirement to allow a third-story addition. The hearing was scheduled to be conducted both in person and virtually.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Wilmington, City of - Dept of Finance's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database