Ware, MA - Church Street Sidewalk Construction RFP
Jul 29, 2026
Closes
Aug 20, 2026
Reconstruction of approx 2,000 lf of sidewalk. Work includes limited sections of new granite curbing, driveway aprons and the installation of ada-compliant curb ramps at every crosswalk. MUTCD pedestrian crossing signs will be installed at and before each crosswalk. New pavement markings will be added at each crossing. Additionally, rectangular rapid flashing beacons (RRFB) will be placed along street and minor utility relocations will be required to meet the new sidewalk elevations.
