Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Coxsackie
Rehabilitation & restoration of existing building with a restroom addition to the east performed under the following multi-prime contracts: general construction, electrical construction, mechanical construction, plumbing construction.
Posted Date
Jul 2, 2026
Due Date
Aug 13, 2026
Release: Jul 2, 2026
Village of Coxsackie
Close: Aug 13, 2026
Rehabilitation & restoration of existing building with a restroom addition to the east performed under the following multi-prime contracts: general construction, electrical construction, mechanical construction, plumbing construction.
AvailableVillage of Coxsackie
The project shall include the following: milling the entire road down 1.5". milling keyways, driveways, and intersecting roads; cleaning and preparing the roadway for paving. Laying down tack coat before paving. Furnishing and installing 1.5", type 6 top course. Paving and tying in all blacktop driveway aprons. Supplying and installing all manhole, valve and catch basin extensions. Road may need binder course before the finished 1.5" blacktop is laid down.
Posted Date
May 28, 2026
Due Date
Jun 15, 2026
Release: May 28, 2026
Village of Coxsackie
Close: Jun 15, 2026
The project shall include the following: milling the entire road down 1.5". milling keyways, driveways, and intersecting roads; cleaning and preparing the roadway for paving. Laying down tack coat before paving. Furnishing and installing 1.5", type 6 top course. Paving and tying in all blacktop driveway aprons. Supplying and installing all manhole, valve and catch basin extensions. Road may need binder course before the finished 1.5" blacktop is laid down.
Village of Coxsackie
Wm. J. Keller & Sons Construction Corp. is soliciting quotes from qualified M/WBE subcontractors and vendors to participate in the Village of Coxsackie Inflow & Infiltration (I&I) Mitigation project (Engineer PN: 24-2888). The opportunity requires a total MWBE participation goal of 20% and seeks subcontractors/vendors to supply services and materials supporting the I&I mitigation work. The notice was published via the New York State Contract Reporter by Delaware Engineering, D.P.C. and is open with responses due in early February 2026.
Posted Date
Jan 26, 2026
Due Date
Feb 6, 2026
Release: Jan 26, 2026
Village of Coxsackie
Close: Feb 6, 2026
Wm. J. Keller & Sons Construction Corp. is soliciting quotes from qualified M/WBE subcontractors and vendors to participate in the Village of Coxsackie Inflow & Infiltration (I&I) Mitigation project (Engineer PN: 24-2888). The opportunity requires a total MWBE participation goal of 20% and seeks subcontractors/vendors to supply services and materials supporting the I&I mitigation work. The notice was published via the New York State Contract Reporter by Delaware Engineering, D.P.C. and is open with responses due in early February 2026.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Sole source is a long shot here—deprioritize and pivot to contracts.
Coops: Frequently procures through NYS OGS and Greene County contracts; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Entity: Village of Coxsackie, NY
Status: No verifiable sole source awards; board minutes not readily accessible. Deprioritize this path.
Board meetings and strategic plans from Village of Coxsackie
The workshop meeting covered several items, including a request to waive late water and sewer fees, a speed limit discussion, negotiations for a fire contract, and the search for a Fire Department consultant. The Board reviewed a local law regarding battery storage facilities, discussed paving bids, reviewed an interfund transfer resolution, and addressed traffic study implementation on Sunset Boulevard. Furthermore, the Board reviewed requests from the Coxsackie Yacht Club regarding an annual fundraiser, approved a fireworks permit for Columbia Memorial Hospital, scheduled a public hearing for the UMH annexation project, discussed a general representation agreement, denied a park wedding request, approved extra hours for a code enforcement secretary, and reviewed police department hiring.
The meeting included discussions on several key topics, such as the approval of a contract for crosswalk installation on Mansion and Bailey Street, requests for water and sewer fee waivers, and the adoption of Local Law #2 of 2026 to prohibit Utility Scale Battery Energy Storage Systems. The Board addressed infrastructure projects, including paving of multiple village streets and engaging with engineering services for traffic study designs. Additionally, the Board handled personnel matters, reviewed monthly financial reports, and scheduled a future public hearing for Local Law #3 concerning the annexation of territory.
The Board reviewed several applications, including the denial of a Special Use Permit for 14 Lawrence Avenue due to non-compliance with dimensional standards for parking and access. Progress on a minor subdivision application for 49-51 Mansion Street was discussed, pending the submission of a survey. An application for work at 49 Bailey Street was withdrawn by the applicant. Additionally, information regarding an upcoming training session on topics including affordable housing and zoning was shared with the board members.
The meeting focused on Local Law #2 of 2026, which proposes prohibiting the siting of Utility Scale Battery Energy Storage Systems within the village. Additionally, the board heard public commentary regarding safety concerns involving e-bikes and electric motocross bikes being operated on sidewalks and public roads, leading to a discussion on current state regulations and potential future local measures to address these safety issues.
The public hearing focused on the State Environmental Quality Review (SEQR) process for the proposed Department of Public Works Garage. The Board reviewed and read the Short Environmental Assessment Form (SEAF) aloud to support a negative environmental impact declaration. Discussion included concerns from residents regarding the project's potential impact on property, the project timeline, construction logistics, and the accessibility of project documentation on the village website. Officials provided clarification on the SEQR process, future public hearing requirements for the Site Plan, and plans to improve transparency regarding project updates.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Coxsackie's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge