Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Buchanan
Work to be done under this contract, identified as sewage plant sludge removal, comprises the removal, transportation and disposal of approx. 1,100,000 gal. of sludge from the holding tank of the village sewage treatment plant and 5 sewage pump station wet wells.
Posted Date
Jun 8, 2026
Due Date
Jun 18, 2026
Release: Jun 8, 2026
Village of Buchanan
Close: Jun 18, 2026
Work to be done under this contract, identified as sewage plant sludge removal, comprises the removal, transportation and disposal of approx. 1,100,000 gal. of sludge from the holding tank of the village sewage treatment plant and 5 sewage pump station wet wells.
AvailableVillage of Buchanan
The work consists of milling and paving. Other related work shall include the replacement of curbs in various locations, adjusting and repairing drainage structures and sanitary manhole structures, adjusting utility frames and covers to grade, as well as preparing, restoring, and cleaning the project area all in accordance with the plans and specifications and as directed by the Engineer.
Posted Date
May 6, 2026
Due Date
May 22, 2026
Release: May 6, 2026
Village of Buchanan
Close: May 22, 2026
The work consists of milling and paving. Other related work shall include the replacement of curbs in various locations, adjusting and repairing drainage structures and sanitary manhole structures, adjusting utility frames and covers to grade, as well as preparing, restoring, and cleaning the project area all in accordance with the plans and specifications and as directed by the Engineer.
Village of Buchanan
The work consists of all labor, materials and equipment necessary to furnish and install new gate valves, valve boxes, and covers including all connection appurtenances, gravel and fill material. Other related work shall include saw cutting concrete and asphalt roadways, excavation, removal and disposal of excavated materials and existing gate valves, restoring asphalt roadways, concrete road base, curbs and sidewalks, as well as restoring and cleaning the project area all in accordance with the plans and specifications as directed by the Village Water Department, during emergency conditions.
Posted Date
-
Due Date
Jun 19, 2024
Release: -
Village of Buchanan
Close: Jun 19, 2024
The work consists of all labor, materials and equipment necessary to furnish and install new gate valves, valve boxes, and covers including all connection appurtenances, gravel and fill material. Other related work shall include saw cutting concrete and asphalt roadways, excavation, removal and disposal of excavated materials and existing gate valves, restoring asphalt roadways, concrete road base, curbs and sidewalks, as well as restoring and cleaning the project area all in accordance with the plans and specifications as directed by the Village Water Department, during emergency conditions.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $20,000, use sole source (for proprietary or compatibility-critical products); if total exceeds $20,000, obtain Village Board approval.
Coops: If not sole source, ask the Village Administrator to piggyback through an available cooperative contract.
Entity: Village of Buchanan (NY)
Thresholds/approvals: Competitive bid threshold is $20,000. Sole source over $20,000 requires Village Board approval.
Board meetings and strategic plans from Village of Buchanan
The board discussed a new application regarding a multifamily dwelling project at 3222 Albany Post Road. Key topics included a request for two front yard setback variances for the proposed buildings and an area variance to increase the allowable percentage of three-bedroom units. The applicants provided details on the site layout, proposed retaining walls, and engineering specifications. Board members questioned the potential need for further variances depending on future planning board findings and addressed the impact of slope disturbances and wall height requirements.
The Planning Board held a public hearing regarding a change of use, special permit, and site plan approval for a commercial construction and equipment storage site at 300 White Street. The board reviewed and ultimately adopted a resolution for the project, subject to various conditions including fire department safety requirements, environmental pollution protection plans, and signage specifications. Additionally, the board granted a 90-day extension for a separate development project at 3095 Albany Post Road while remaining engineering items are finalized.
The board conducted a public hearing regarding a variance application for property at 175 Henry Street, which was granted for several area variances. A public hearing for a property at 223 Gallagher Street was adjourned due to a lack of proper notification. Additionally, the board addressed preliminary submissions for variances at 3208 Albany Post Road and 260 Westchester Avenue. Discussions were also held regarding permitted uses for a property at 200 Tate Avenue, resulting in the scheduling of a future public hearing to interpret zoning regulations.
The Planning Board addressed several site plan applications and subdivisions. Key discussions included a site plan review for a proposed mixed-use building, a public hearing for a site plan application at a service station, and a request for an ice cream parlor approval, which was granted. Additionally, the Board reviewed violations concerning a diesel truck and machinery repair property, and scheduled a public hearing for a subdivision application.
The Zoning Board reviewed an application for an area variance regarding property coverage at 4 Valerie Court. The discussion addressed the existing lot coverage percentage of 37%, which exceeds the permitted 30%, and examined the drainage and property impact. The Board determined the need for a licensed professional to calculate exact lot coverage and scheduled a site visit along with a public hearing for the following month.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Buchanan's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge