URI Carothers Library Critical Power Upgrade (Request for Quote)
Posted
Aug 5, 2026
Sep 9, 2026
Replace critical power infrastructure at the library. Scope includes replacement of the main transformers, switchgear, and emergency/standby power systems, along with installation of a temporary transformer, a robust screen wall around the existing equipment yard, and civil/site work to support underground conduit routing beneath the loading dock drive into the interior electrical room. See attached files.
