Construction of the URI Bay Campus Phase 2 Projects RFP
Posted
Sep 11, 2026
Sep 29, 2026
Work includes 03c Site Concrete, 05b Misc Metals, 06b Millwork, 07c Firestopping, 07d Roofing, 07e Fireproofing, 08c Doors, Frames & Hardware, 08e Overhead Doors and Dock Equipment, 09a Metal Stud & Drywall, 09c Acoustical Ceiling, 09e Resilient and Carpet Flooring, 09g Tile, 09i Resinous Flooring, 09j Painting, 10a Signage, 10c Specialties & Misc Access, 12a Lab Casework, 12c Window Treatment, 13b Environmental Room, 31b Geothermal Wells, 32a Landscape, 35b Water Storage Tank, 35c Bridge Crane, 35d Tank Coatings.
