Higher EducationNC
Posted
Jul 31, 2026
Sep 9, 2026
Keihin Auditorium Audio Visual Upgrade (Request for Quote)
Work includes to modernize / replace the existing audio-visual controls, processing and console equipment.
Description: Replace critical power infrastructure at the library. Scope includes replacement of the main transformers, switchgear, and emergency/standby power systems, along with installation of a temporary transformer, a robust screen wall around the existing equipment yard, and civil/site work to support underground conduit routing beneath the loading dock drive into the interior electrical room. See attached files.
HigherEducation · RI, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Higher EducationNC
Posted
Jul 31, 2026
Sep 9, 2026
Work includes to modernize / replace the existing audio-visual controls, processing and console equipment.
Posted
Aug 14, 2026
Sep 8, 2026
The contractor shall furnish all necessary materials, equipment, and related services as necessary to (1) uninstall the existing cameras and coaxial cabling, and (2) install new digital cameras and new ethernet cabling compatible with the existing head end system, and (3) include ip licenses for all cameras.
Ohio Department of Transportation
State AgencyOH
Posted
Aug 24, 2026
Sep 9, 2026
Purchase of The AP7900B switched rack power distribution unit from APC.
CityCA
Posted
Aug 27, 2026
Sep 10, 2026
Library materials and processing services.
Decision makers connected to this RFP from University Of Rhode Island.