Wheatland Cemetery Well No. 1 Project RFP
Aug 5, 2026
Closes
Aug 25, 2026
Work includes approx. 500 LF of 6 1/4" drill pilot hole; 50 LF of surface casing, drilling; 450 LF of 17½ borehole; 300 LF of 12¾" O.D. steel casing; 200 LF of 12" stainless steel screen; 205 LF of filter sand.