Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of St. Michaels
Work will include removal of the following items: remaining impervious gravel surfaces as indicated on the plans, select trees, remaining abandoned utilities, a culvert pipe, garage building, debris piles, invasive species, electrical outlets, and drainage inlet pipes.
Posted Date
Jul 14, 2026
Due Date
Aug 14, 2026
Release: Jul 14, 2026
Town of St. Michaels
Close: Aug 14, 2026
Work will include removal of the following items: remaining impervious gravel surfaces as indicated on the plans, select trees, remaining abandoned utilities, a culvert pipe, garage building, debris piles, invasive species, electrical outlets, and drainage inlet pipes.
AvailableTown of St. Michaels
Selection of a qualified engineering firm to prepare Final Design and Construction Documents for public marina and roadway improvements along West Harbor Road and East Chew Avenue, St. Michaels, MD, to mitigate sea level rise and stormwater flooding.
Posted Date
Mar 9, 2026
Due Date
Apr 9, 2026
Release: Mar 9, 2026
Town of St. Michaels
Close: Apr 9, 2026
Selection of a qualified engineering firm to prepare Final Design and Construction Documents for public marina and roadway improvements along West Harbor Road and East Chew Avenue, St. Michaels, MD, to mitigate sea level rise and stormwater flooding.
Town of St. Michaels
Engineering design services are sought for stormwater drainage and water quality improvements, including concept development, construction design, and permitting, for specific neighborhoods in St. Michaels and the Lower Choptank Watershed.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Town of St. Michaels
Close: Feb 4, 2026
Engineering design services are sought for stormwater drainage and water quality improvements, including concept development, construction design, and permitting, for specific neighborhoods in St. Michaels and the Lower Choptank Watershed.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge