Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of South Prairie
Installing a new water main. Water main installation project are: installation of approx. 630 LF of new 8" PVC C900 water main. Installation of valves. Installation of water sampling station. Connections to the existing south prairie water system. Abandonment of existing water mains in-place. Removal, haul, and disposal of existing asbestos cement (AC) water mains in compliance with all applicable local, state, and federal requirements. Asphalt concrete pavement patching and surface restoration.
Posted Date
Mar 11, 2026
Due Date
Apr 2, 2026
Release: Mar 11, 2026
Town of South Prairie
Close: Apr 2, 2026
Installing a new water main. Water main installation project are: installation of approx. 630 LF of new 8" PVC C900 water main. Installation of valves. Installation of water sampling station. Connections to the existing south prairie water system. Abandonment of existing water mains in-place. Removal, haul, and disposal of existing asbestos cement (AC) water mains in compliance with all applicable local, state, and federal requirements. Asphalt concrete pavement patching and surface restoration.
AvailableTown of South Prairie
This project will provide pedestrian facility improvements, including approx. Adding 267 SY of concrete sidewalk, Adding two concrete curb ramps, Adding 180 LF of pedestrian fencing, Adding 110 LF of concrete traffic curb and gutter, Adding 12 SY of concrete driveway entrance, Removing and replacing 33 SY of concrete sidewalk, Removing and replacing 12 LF of concrete traffic curb and gutter, Grinding 5 sidewalk joints.
Posted Date
Feb 25, 2026
Due Date
Mar 31, 2026
Release: Feb 25, 2026
Town of South Prairie
Close: Mar 31, 2026
This project will provide pedestrian facility improvements, including approx. Adding 267 SY of concrete sidewalk, Adding two concrete curb ramps, Adding 180 LF of pedestrian fencing, Adding 110 LF of concrete traffic curb and gutter, Adding 12 SY of concrete driveway entrance, Removing and replacing 33 SY of concrete sidewalk, Removing and replacing 12 LF of concrete traffic curb and gutter, Grinding 5 sidewalk joints.
AvailableTown of South Prairie
Regrading +/-6,500 SY of gravel roadway, Supplying, spreading and compacting approx. 1,000 TONS of crushed surfacing top course., Applying high float emulsion asphalt to approx. 6,000 SY of graveled roadway, Crack Sealing approx. 2,200 LF of roadway.
Posted Date
Jan 29, 2025
Due Date
Feb 26, 2025
Release: Jan 29, 2025
Town of South Prairie
Close: Feb 26, 2025
Regrading +/-6,500 SY of gravel roadway, Supplying, spreading and compacting approx. 1,000 TONS of crushed surfacing top course., Applying high float emulsion asphalt to approx. 6,000 SY of graveled roadway, Crack Sealing approx. 2,200 LF of roadway.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Town of South Prairie
The council meeting included discussions and actions on several topics. The Sheriff's Office reported on town patrols and incidents, with a request for increased police presence. Grant quotes were being obtained for paving, fencing, and landscaping projects. Street signs were noted to be in poor shape and will be replaced or refaced. Amendments to the FY 2024-25 budget were reviewed and adopted, and the FY 2025-26 budget was reviewed and adopted with a recommendation for additional payments to the Sewer Loan. The town is still seeking a maintenance worker. A red crabapple tree was planted for Arbor Day. The Town Mayor & Council Salary Increase was tabled. A Community Yard Sale was announced, and volunteers are needed for a Trail Work Day. Work is progressing on the town website update. An update was provided on the previous executive session, and the Seneca Ave. Excavation matter will be referred back to the County offices. A banner will be ordered to promote the Community Yard Sale.
The council meeting included discussions on traffic issues related to bridge repairs, code enforcement reports, and grant submissions for playground improvements. The council approved funding for tree removal, parking area installations, walking paths, and playground fencing. The Mayor reported on street and sewer projects, including paving and repairs by the County Roads Department. Correspondence included discussions on payroll issues and accounting services. Old business included tabling the Town Mayor & Council Salary Increase, a zoning ordinance violation, and updates on a trail work day and community yard sale. New business addressed the need to raise sewer rates and proposed a rate increase plan.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of South Prairie's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database