Stormwater Remediation and Drainage Improvements at the Petersburgh Town Hall Building RFP
Posted
Nov 5, 2026
Nov 18, 2026
Provide exterior east-wall footing drain installation (70 lf perforated pipe, catch basin, crushed stone, 6" outlet pipe); waterproofing of exposed foundation surfaces; site grading / surface runoff redirection; interior drainage improvements (sump pump, curtain drain extension, demo);


